An improved opportunity maintenance model of complex system
暂无分享,去创建一个
[1] Makarand S. Kulkarni,et al. Optimisation of opportunistic maintenance of a multi-component system considering the effect of failures on quality and production schedule: A case study , 2013 .
[2] Laibin Zhang,et al. Risk based opportunistic maintenance model for complex mechanical systems , 2014, Expert Syst. Appl..
[3] Sunantha Teyarachakul,et al. Learning effects on maintenance outsourcing , 2009, Eur. J. Oper. Res..
[4] M. Jaber,et al. Vendor managed inventory (VMI) with consignment considering learning and forgetting effects , 2012 .
[5] Shun Jia,et al. Energy modeling method of machine-operator system for sustainable machining , 2018, Energy Conversion and Management.
[6] Jinqiu Hu. Opportunistic Maintenance Strategy for Complex Oil and Gas Production Equipment Based on Fault Preventive Defense , 2013 .
[7] Wenjing Lu,et al. Improved impact assessment of odorous compounds from landfills using Monte Carlo simulation. , 2019, The Science of the total environment.
[8] Nidhal Rezg,et al. Optimization of Two-Level Disassembly/Remanufacturing/Assembly System with an Integrated Maintenance Strategy , 2018 .
[9] Wei Liang,et al. Opportunistic predictive maintenance for complex multi-component systems based on DBN-HAZOP model , 2012 .
[10] Zhang Xiu-shan. Disassembly sequence generation algorithm based on spherical map and disassembly tree , 2010 .
[11] Cristiano Alexandre Virgínio Cavalcante,et al. Multi-criteria model to support the definition of opportunistic maintenance policy: A study in a cogeneration system , 2015 .
[12] Tangbin Xia,et al. Production-driven opportunistic maintenance for batch production based on MAM-APB scheduling , 2015, Eur. J. Oper. Res..
[13] Athena Zitrou,et al. The signal model: A model for competing risks of opportunistic maintenance , 2011, Eur. J. Oper. Res..
[14] Ying Liu,et al. Therblig-embedded value stream mapping method for lean energy machining , 2017 .
[15] Zhigang Tian,et al. Opportunistic maintenance for wind farms considering multi-level imperfect maintenance thresholds , 2012 .
[16] James E. Ward,et al. Effect of Learning and Forgetting on Batch Sizes , 2011 .