Deflection Control of Long-Span PSC Box-Girder Bridge Based on Field Monitoring and Probabilistic FEA
暂无分享,去创建一个
[1] João Bento,et al. Construction assessment and long-term prediction of prestressed concrete bridges based on monitoring data , 2013 .
[2] Peter F. Takács. Deformations in Concrete Cantilever Bridges: Observations and Theoretical Modelling , 2002 .
[3] C. Q. Li,et al. RELIABILITY ANALYSIS OF CREEP AND SHRINKAGE EFFECTS , 1992 .
[4] Comite Euro-International du Beton,et al. CEB-FIP Model Code 1990 , 1993 .
[5] Mark G. Stewart,et al. Probabilistic analysis of time-dependent deflections of RC flexural members , 2001 .
[6] Ian N. Robertson,et al. Prediction of vertical deflections for a long-span prestressed concrete bridge structure , 2005 .
[7] Zdeněk P. Bažant,et al. Random creep and shrinkage in structures: Sampling , 1985 .
[8] Jeffrey A. Laman,et al. Long-Term Response Prediction of Integral Abutment Bridges , 2009 .
[9] Joaquim Figueiras,et al. Numerical Evaluation of the Long-Term Behavior of Precast Continuous Bridge Decks , 2012 .
[10] M. Stein. Large sample properties of simulations using latin hypercube sampling , 1987 .
[11] Rajeev Goel,et al. Comparative Study of Various Creep and Shrinkage Prediction Models for Concrete , 2007 .
[12] Alfred G. Bishara,et al. ANALYSIS OF CAST-IN-PLACE CONCRETE SEGMENTAL CANTILEVER BRIDGES , 1990 .
[13] Weichen Xue,et al. Long-Term Behavior of Prestressed Composite Beams at Service Loads for One Year , 2008 .
[14] Qiang Yu,et al. Excessive Long-Time Deflections of Prestressed Box Girders. I: Record-Span Bridge in Palau and Other Paradigms , 2012 .
[15] Qiang Yu,et al. Excessive Long-Time Deflections of Prestressed Box Girders. II: Numerical Analysis and Lessons Learned , 2012 .
[16] Aiqun Li,et al. Deflection Reliability Analysis of PSC Box-Girder Bridge under High-Speed Railway Loads , 2012 .
[17] João Bento,et al. Assessment and Management of Concrete Bridges Supported by Monitoring Data-Based Finite-Element Modeling , 2014 .
[18] Zdeněk P. Bažant,et al. SHEAR LAG EFFECT AND UNCERTAINTY IN CONCRETE BOX GIRDER CREEP , 1987 .
[19] Maria Q. Feng,et al. Model Updating of Railway Bridge Using In Situ Dynamic Displacement Measurement under Trainloads , 2015 .
[20] Peggy A. Johnson,et al. Monte Carlo simulation of immediate and time-dependent deflections of reinforced concrete beams and slabs , 2004 .
[21] R. Taylor,et al. Thermomechanical analysis of viscoelastic solids , 1970 .
[22] Sandeep Baweja,et al. Justification and refinements of model B3 for concrete creep and shrinkage 1. statistics and sensitivity , 1995 .
[23] A. A. Al-Manaseer,et al. Statistical evaluation of shrinkage and creep models , 2005 .
[24] Giuseppe Lacidogna,et al. Approximate expressions for the ageing coefficient and the relaxation function in the viscoelastic analysis of concrete structures , 1996 .
[25] Yong Jiang,et al. Uncertainty Analysis of Creep and Shrinkage Effects in Long-Span Continuous Rigid Frame of Sutong Bridge , 2011 .
[26] In Hwan Yang,et al. Uncertainty and sensitivity analysis of time-dependent effects in concrete structures , 2007 .
[27] Håkan Sundquist,et al. Time-dependent analyses of segmentally constructed balanced cantilever bridges , 2010 .
[28] Dan M. Frangopol,et al. Time-Dependent Reliability of PSC Box-Girder Bridge Considering Creep, Shrinkage, and Corrosion , 2011 .