Bi-objective optimization of non-periodic preventive maintenance strategy by considering time value of money

Recently, design of preventive maintenance (PM) policies during the warranty period has attracted the attention of researchers. The methods mainly design warranty servicing strategies in a way that reduce the cost imposed on the manufacturer without considering the impact of customer dissatisfaction. While dissatisfaction with a product is an important issue which may result in the loss of potential buyers and switching existing buyers to competitors. Therefore, this study develops a bi-objective model which simultaneously minimizes the manufacturer and the buyer cost under a Non-homogeneous Poisson Process framework. Also, a non-periodic preventive maintenance strategy is presented in which PM actions are performed at discrete time instants in a way that the expected number of failures remains a constant value over all PM intervals. Furthermore, it is a known fact that the value of money reduces over time due to different reasons and has a significant impact on long-term contracts. Since PMs and repairs are conducted at different times, the time value of money is considered to estimate the cost more accurately. A comparative study is conducted to support this claim that the presented non-periodic reliability-based PM policy has a better performance in comparison with a periodic PM policy.

[1]  Mahmood Shafiee,et al.  Maintenance models in warranty: A literature review , 2013, Eur. J. Oper. Res..

[2]  S. Bouguerra,et al.  A decision model for adopting an extended warranty under different maintenance policies , 2012 .

[3]  H. Teng Extended warranty pricing considering the time of money , 2006 .

[4]  Seyed Taghi Akhavan Niaki,et al.  Optimal strategies for price, warranty length, and production rate of a new product with learning production cost , 2013 .

[5]  Makarand S. Kulkarni,et al.  A methodology for design for warranty with focus on reliability and warranty policies , 2013 .

[6]  Anis Chelbi,et al.  Joint optimization of design, warranty and price for products sold with maintenance service contracts , 2017, Reliab. Eng. Syst. Saf..

[7]  D. N. Prabhakar Murthy,et al.  Product warranty logistics: Issues and challenges , 2004, Eur. J. Oper. Res..

[8]  Tzu-Chun Weng,et al.  Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period , 2017, Eur. J. Oper. Res..

[9]  Yeu-Shiang Huang,et al.  A study on decisions of warranty, pricing, and production with insufficient information , 2010, Comput. Ind. Eng..

[10]  Min Xie,et al.  On a general periodic preventive maintenance policy incorporating warranty contracts and system ageing losses , 2011 .

[11]  Stefanka Chukova,et al.  Warranty cost analysis: Increasing warranty repair times , 2018 .

[12]  Xiaolin Wang,et al.  A study of availability-based warranty policy , 2016, 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM).

[13]  Minjae Park,et al.  Cost models for age replacement policies and block replacement policies under warranty , 2016 .

[14]  Yeu-Shiang Huang,et al.  A customized two-dimensional extended warranty with preventive maintenance , 2017, Eur. J. Oper. Res..

[15]  D. N. Prabhakar Murthy,et al.  Product warranty and reliability , 2006, Ann. Oper. Res..

[16]  Mojtaba Salehi,et al.  A robust interactive approach to optimize correlated multiple responses , 2013 .

[17]  Kouroush Jenab,et al.  Fitting the three-parameter Weibull distribution with Cross Entropy , 2013 .

[18]  Kouroush Jenab,et al.  Utilisation of pruned Pareto-optimal solutions in the multi objective optimisation: an application to system redundancy allocation problems , 2013, Int. J. Appl. Decis. Sci..

[19]  El-Ghazali Talbi,et al.  Metaheuristics - From Design to Implementation , 2009 .

[20]  Ezzatollah Asgharizadeh,et al.  Optimizing the warranty period by cuckoo meta-heuristic algorithm in heterogeneous customers’ population , 2013 .

[21]  Dieu Tien Bui,et al.  A novel hybrid artificial intelligent approach based on neural fuzzy inference model and particle swarm optimization for horizontal displacement modeling of hydropower dam , 2018, Neural Computing and Applications.

[22]  M. Kijima SOME RESULTS FOR REPAIRABLE SYSTEMS WITH GENERAL REPAIR , 1989 .

[23]  Amin Mahmoudi,et al.  Analyzing price, warranty length, and service capacity under a fuzzy environment: Genetic algorithm and fuzzy system , 2013 .

[24]  D. Murthy,et al.  New product warranty: A literature review , 2002 .

[25]  Ata Allah Taleizadeh,et al.  Hybrid NSGA-II for an imperfect production system considering product quality and returns under two warranty policies , 2019, Appl. Soft Comput..

[26]  Anis Chelbi,et al.  Investigating reliability improvement of second-hand production equipment considering warranty and preventive maintenance strategies , 2017, Int. J. Prod. Res..

[27]  Dong Ho Park,et al.  Optimal maintenance strategy under renewable warranty with repair time threshold , 2017 .

[28]  Kamran Shahanaghi,et al.  Failure modeling and optimizing preventive maintenance strategy during two-dimensional extended warranty contracts , 2013 .

[29]  Wei Xie,et al.  Two-dimensional warranty: A literature review , 2017 .

[30]  Chun Su,et al.  Optimizing upgrade level and preventive maintenance policy for second-hand products sold with warranty , 2014 .

[31]  Zhigang Tian,et al.  Modelling upgrading maintenance policy in the one-dimensional renewing warranty period , 2016 .

[32]  Ali Salmasnia,et al.  A joint design of production run length, maintenance policy and control chart with multiple assignable causes , 2017 .

[33]  Ali Salmasnia,et al.  A bi-objective model to optimize periodic preventive maintenance strategy during warranty period by considering customer satisfaction , 2017, Int. J. Syst. Assur. Eng. Manag..

[34]  Armin Jabbarzadeh,et al.  A novel intelligent particle swarm optimization algorithm for solving cell formation problem , 2017, Neural Computing and Applications.

[35]  D. N. Prabhakar Murthy,et al.  Warranty and discrete preventive maintenance , 2004, Reliab. Eng. Syst. Saf..

[36]  Che Soong Kim,et al.  WARRANTY AND PREVENTIVE MAINTENANCE , 2001 .

[37]  Xiaolin Wang,et al.  A two-dimensional preventive maintenance strategy for items sold with warranty , 2016 .

[38]  Riccardo Poli,et al.  Particle swarm optimization , 1995, Swarm Intelligence.