Operations Research in passenger railway transportation
暂无分享,去创建一个
Dennis Huisman | Leo Kroon | Ramon M. Lentink | Michiel Vromans | Michiel J. C. M. Vromans | D. Huisman | L. Kroon | M. Vromans | R. Lentink
[1] J Backman,et al. RAILROAD CAPACITY AND TRAFFIC ANALYSIS USING SIMON , 1996 .
[2] Malachy Carey,et al. Scheduling and Platforming Trains at Busy Complex Stations , 2003 .
[3] Julie Jespersen-Groth,et al. Estimates on Rolling Stock and Crew in DSB S-tog Based on Timetables , 2004, ATMOS.
[4] M. Wahlborg,et al. Simulation Models: Important Aids ForBanverket's Planning Process , 1970 .
[5] Alain Billionnet,et al. Using Integer Programming to Solve the Train-Platforming Problem , 2003, Transp. Sci..
[6] Richard J. Boucherie,et al. Running times on railway sections with heterogeneous train traffic , 1998 .
[7] Michael R. Bussieck,et al. Scheduling trams in the morning , 1999, Math. Methods Oper. Res..
[8] M. V. Riel,et al. Crew Scheduling for Netherlands Railways “ Destination : Customer ” , 2000 .
[9] Stefan E. Karisch,et al. Airline Crew Rostering: Problem Types, Modeling, and Optimization , 2004, Ann. Oper. Res..
[10] Malachy Carey,et al. A model and strategy for train pathing with choice of lines, platforms, and routes , 1994 .
[11] U. T. Zimmermann,et al. Train Schedule Optimization in Public Rail Transport , 2003 .
[12] Arjang A. Assad,et al. MODELS FOR RAIL TRANSPORTATION , 1980 .
[13] Matteo Fischetti,et al. A Heuristic Method for the Set Covering Problem , 1999, Oper. Res..
[14] Richard J. Boucherie,et al. A stochastic model for railway networks , 1998 .
[15] M. Galaverna,et al. An object-oriented approach to the train platforming problem , 2004 .
[16] Stephen Norris,et al. A Flexible, Fast, and Optimal Modeling Approach Applied to Crew Rostering at London Underground , 2004, Ann. Oper. Res..
[17] Wolfgang Domschke,et al. Schedule synchronization for public transit networks , 1989 .
[18] Matteo Fischetti,et al. Modeling and Solving the Crew Rostering Problem , 1998, Oper. Res..
[19] Jean-François Cordeau,et al. Simultaneous Assignment of Locomotives and Cars to Passenger Trains , 1998, Oper. Res..
[20] Leo G. Kroon,et al. Allocation of Railway Rolling Stock for Passenger Trains , 2002, Transp. Sci..
[21] Samuel J. Raff,et al. Routing and scheduling of vehicles and crews : The state of the art , 1983, Comput. Oper. Res..
[22] Rob M.P. Goverde,et al. PETER, A PERFORMANCE EVALUATOR FOR RAILWAY TIMETABLES , 2000 .
[23] Matteo Fischetti,et al. A Heuristic Algorithm for the Set Covering Problem , 1996, IPCO.
[24] D Middelkoop,et al. Train network simulator for support of network wide planning of infrastructure and timetables , 2000 .
[25] Paolo Toth,et al. A Survey of Optimization Models for Train Routing and Scheduling , 1998, Transp. Sci..
[26] Matteo Fischetti,et al. Crew Scheduling for Netherlands Railways: "destination: customer" , 2000 .
[27] Guy Desaulniers,et al. Dispatching Buses in a Depot Using Block Patterns , 2006, Transp. Sci..
[28] Peter Brucker,et al. Routing of railway carriages: A case study , 1999 .
[29] Leo G. Kroon,et al. Routing Trains Through Railway Stations: Model Formulation and Algorithms , 1996, Transp. Sci..
[30] Leon W P Peeters,et al. Cyclic Railway Timetable Optimization , 2003 .
[31] Martin W. P. Savelsbergh,et al. Branch-and-Price: Column Generation for Solving Huge Integer Programs , 1998, Oper. Res..
[32] Leo Kroon,et al. Applying Operations Research techniques to planning of train shunting , 2003 .
[33] R.M.P. Goverde,et al. IMPROVING PUNCTUALITY AND TRANSFER RELIABILITY BY RAILWAY TIMETABLE OPTIMIZATION , 1999 .
[34] Anthony Wren,et al. Experiences with a Flexible Driver Scheduler , 2001 .
[35] I A Hansen,et al. STATION CAPACITY AND STABILITY OF TRAIN OPERATIONS , 2000 .
[36] Leo G. Kroon,et al. A Variable Trip Time Model for Cyclic Railway Timetabling , 2003, Transp. Sci..
[37] K. Nachtigall. Periodic network optimizationi and fixed interval timetables , 1999 .
[38] Malachy Carey,et al. Ex ante heuristic measures of schedule reliability , 1999 .
[39] Stefan Voß,et al. Computer-Aided Scheduling of Public Transport , 2001 .
[40] Daniel Hürlimann,et al. Objektorientierte Modellierung von Infrastrukturelementen und Betriebsvorgängen im Eisenbahnwesen , 2002 .
[41] Rob M.P. Goverde,et al. TNV-PREPARE: ANALYSIS OF DUTCH RAILWAY OPERATIONS BASED ON TRAIN DETECTION DATA , 2000 .
[42] Jacques Desrosiers,et al. Time Constrained Routing and Scheduling , 1992 .
[43] Leo G. Kroon,et al. A Branch-and-Cut Approach for Solving Railway Line-Planning Problems , 2004, Transp. Sci..
[44] R. Bergmark,et al. Railroad Capacity And Traffic Analysis UsingSIMON , 1970 .
[45] Leo Kroon,et al. A Cycle Based Optimization Model for the Cyclic Railway Timetabling Problem , 2001 .
[46] Leo G. Kroon,et al. Efficient Circulation of Railway Rolling Stock , 2002, Transp. Sci..
[47] Nejib Ben-Khedher,et al. Schedule Optimization at SNCF: From Conception to Day of Departure , 1998, Interfaces.
[48] Malachy Carey,et al. Properties of expected costs and performance measures in stochastic models of scheduled transport , 1995 .
[49] N. Tomii,et al. Depot Shunting Scheduling Using Combined Genetic Algorithm And PERT , 2000 .
[50] Jean-François Cordeau,et al. A Benders Decomposition Approach for the Locomotive and Car Assignment Problem , 1998, Transp. Sci..
[51] Peter Brucker,et al. Routing of Railway Carriages , 2003, J. Glob. Optim..
[52] Karl Nachtigall,et al. A genetic algorithm approach to periodic railway synchronization , 1996, Comput. Oper. Res..
[53] Giorgio Gallo,et al. Dispatching Buses in Parking Depots , 2001, Transp. Sci..
[54] I A Hansen,et al. Analysis of scheduled and real capacity utilisation at a major Dutch railway station , 2004 .
[55] Leo G. Kroon,et al. A rolling stock circulation model for combining and splitting of passenger trains , 2006, Eur. J. Oper. Res..
[56] François Soumis,et al. An Optimization Model for the Simultaneous Operational Flight and Pilot Scheduling Problem , 2001, Manag. Sci..
[57] Thomas Winter,et al. Online and Real-Time Dispatching Problems , 1999 .
[58] Subiono. On classes of min-max-plus systems and their applications , 2000 .
[59] Lex Schrijver,et al. Minimum circulation of railway stock , 1993 .
[60] A H Kaas,et al. Punctuality Model For Railways , 2000 .
[61] Uwe T. Zimmermann,et al. Real-time dispatch of trams in storage yards , 2000, Ann. Oper. Res..
[62] Dennis Huisman,et al. Shunting of Passenger Train Units in a Railway Station , 2002, Transp. Sci..
[63] J.H.M. Goossens,et al. Models and algorithms for railway line planning problems , 2004 .
[64] Erhan Kozan,et al. Modeling Train Delays in Urban Networks , 1998, Transp. Sci..
[65] Leo G. Kroon,et al. Reinventing Crew Scheduling at Netherlands Railways , 2004, Interfaces.
[66] Erhan Kozan,et al. Modelling delay risks associated with a train schedule , 1995 .
[67] Malachy Carey. Optimizing scheduled times, allowing for behavioural response , 1998 .
[68] Norio Tomii,et al. An Algorithm for Station Shunting Scheduling Problems Combining Probabilistic Local Search and PERT , 1999, IEA/AIE.
[69] Richard J. Boucherie,et al. A solvable queueing network model for railway networks and its validation and applications for the Netherlands , 2002, Eur. J. Oper. Res..
[70] Walter Ukovich,et al. A Mathematical Model for Periodic Scheduling Problems , 1989, SIAM J. Discret. Math..
[71] G. Maróti,et al. Maintenance Routing for Train Units: The Transition Model , 2005, Transp. Sci..
[72] Jacques Desrosiers,et al. OPERATIONAL CAR ASSIGNMENT AT VIA RAIL CANADA , 2000 .
[73] Michiel A. Odijk,et al. A CONSTRAINT GENERATION ALGORITHM FOR THE CONSTRUCTION OF PERIODIC RAILWAY TIMETABLES , 1996 .
[74] Leo Kroon,et al. Maintenance routing for train units: the scenario model , 2004 .