Thermal damage of sulfur processed chamber under Claus operating reaction conditions—A case study
暂无分享,去创建一个
[1] T. Abdullah,et al. Case study on thermal impact of novel corrosion inhibitor on mild steel , 2018, Case Studies in Thermal Engineering.
[2] A. Shahsavand,et al. Maximization of sulfur recovery efficiency via coupled modification of GTU and SRU processes , 2017 .
[3] M. Mehrpooya,et al. Modeling and multi-optimization of thermal section of Claus process based on kinetic model , 2017 .
[4] H. Ganji,et al. Thermo-kinetic modeling and optimization of the sulfur recovery unit thermal stage , 2016 .
[5] H. Ganji,et al. Kinetic modeling and optimization of Claus reaction furnace , 2016 .
[6] Giulia Bozzano,et al. Model-based optimization of sulfur recovery units , 2014, Comput. Chem. Eng..
[7] C. Sadik,et al. Recent advances in silica-alumina refractory: A review , 2014 .
[8] B. ZareNezhad,et al. Evaluation of different alternatives for increasing the reaction furnace temperature of Claus SRU by chemical equilibrium calculations , 2008 .
[9] D. Brosnan. Alumina-Silica Brick , 2004 .
[10] N. Khalil,et al. Sintering of magnesia refractories through the formation of periclase–forsterite–spinel phases , 2005 .
[11] R. J. Fordham,et al. High temperature corrosion of technical ceramics , 1990 .