Critical tools identification and characteristics curves construction in a wafer fabrication facility

The purpose of this research was to identify the factors in a wafer fabrication facility that significantly affect the cycle times of two main technologies that are currently in process and in demand for the next few years. Moreover, the goal was to construct the characteristics curves that would provide information about the different capabilities of a wafer fabrication facility for several improvement scenarios. A valid simulation model of the whole production line of the fabrication facility was built. The input factors in the fab that significantly affect cycle time, were identified through factor screening experiments. Based on these factors, several scenarios involving addition of tools, were identified and the characteristics curves were constructed for each scenario. These characteristics curves were used to relate cycle time to production volume capacities.

[1]  S. S. Kramer Total cycle time management by operational elements , 1989, IEEE/SEMI International Semiconductor Manufacturing Science Symposium.

[2]  M. Page The free factory: cutting cycle time and gaining output , 1996, IEEE/SEMI 1996 Advanced Semiconductor Manufacturing Conference and Workshop. Theme-Innovative Approaches to Growth in the Semiconductor Industry. ASMC 96 Proceedings.

[3]  Mansooreh Mollaghasemi,et al.  Validation and verification of the simulation model of a photolithography process in semiconductor manufacturing , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).

[4]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[5]  D. E. Kirjassof,et al.  Large-scale business process improvement: reducing total make-to-market cycle time , 1993, [1993 Proceedings] IEEE/SEMI International Semiconductor Manufacturing Science Symposium.

[6]  W. Laure Cycle time and bottleneck analysis , 1999, 10th Annual IEEE/SEMI. Advanced Semiconductor Manufacturing Conference and Workshop. ASMC 99 Proceedings (Cat. No.99CH36295).

[7]  D. P. Martin Total operational efficiency (TOE): the determination of two capacity and cycle time components and their relationship to productivity improvements in a semiconductor manufacturing line , 1999, 10th Annual IEEE/SEMI. Advanced Semiconductor Manufacturing Conference and Workshop. ASMC 99 Proceedings (Cat. No.99CH36295).

[8]  Jack P. C. Kleijnen,et al.  EUROPEAN JOURNAL OF OPERATIONAL , 1992 .

[9]  Reha Uzsoy,et al.  Quantifying the benefits of cycle time reduction in semiconductor wafer fabrication , 2000 .

[10]  Rajan Suri,et al.  Quick Response Manufacturing , 1998 .

[11]  D. Meyersdorf,et al.  Cycle time reduction for semiconductor wafer fabrication facilities , 1997, 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop ASMC 97 Proceedings.

[12]  D. P. Martin Capacity and cycle time-throughput understanding system (CAC-TUS) an analysis tool to determine the components of capacity and cycle time in a semiconductor manufacturing line , 1999, 10th Annual IEEE/SEMI. Advanced Semiconductor Manufacturing Conference and Workshop. ASMC 99 Proceedings (Cat. No.99CH36295).