Wyznaczanie wariantów czasowo-kosztowych realizacji projektu

[1]  A. E. Oluleye,et al.  Scheduling of projects under the condition of inflation , 1993 .

[2]  Mario Vanhoucke New computational results for the discrete time/cost trade-off problem with time-switch constraints , 2005 .

[3]  Helena Gaspars,et al.  Propozycja nowego algorytmu w analizie czasowo-kosztowej przedsięwzięć , 2006 .

[4]  Nicolai Siemens A Simple CPM Time-Cost Tradeoff Algorithm , 1971 .

[5]  M. Dessouky,et al.  Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept , 1977 .

[6]  Mario Vanhoucke,et al.  The Project Scheduling Game (PSG): Simulating Time/Cost Trade-Offs in Projects , 2005 .

[7]  Helena Gaspars Analiza czasowo-kosztowa (CPM-COST). Algorytm a model optymalizacyjny , 2006 .

[8]  Chris Hendrickson,et al.  Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders , 1989 .

[9]  Erik Demeulemeester,et al.  Discrete time/cost trade-offs in project scheduling with time-switch constraints , 2002, J. Oper. Res. Soc..

[10]  S. K. Goyal Note---A Note on “A Simple CPM Time-Cost Tradeoff Algorithm” , 1975 .

[11]  N. R. Achuthan,et al.  Project Scheduling under Time Dependent Costs – A Branch and Bound Algorithm , 2001, Ann. Oper. Res..

[12]  Wallace B. S. Crowston,et al.  Decision CPM: A Method for Simultaneous Planning, Scheduling, and Control of Projects , 1967, Oper. Res..

[13]  Mario Vanhoucke,et al.  The discrete time/cost trade-off problem: extensions and heuristic procedures , 2007 .