Wyznaczanie wariantów czasowo-kosztowych realizacji projektu
暂无分享,去创建一个
[1] A. E. Oluleye,et al. Scheduling of projects under the condition of inflation , 1993 .
[2] Mario Vanhoucke. New computational results for the discrete time/cost trade-off problem with time-switch constraints , 2005 .
[3] Helena Gaspars,et al. Propozycja nowego algorytmu w analizie czasowo-kosztowej przedsięwzięć , 2006 .
[4] Nicolai Siemens. A Simple CPM Time-Cost Tradeoff Algorithm , 1971 .
[5] M. Dessouky,et al. Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept , 1977 .
[6] Mario Vanhoucke,et al. The Project Scheduling Game (PSG): Simulating Time/Cost Trade-Offs in Projects , 2005 .
[7] Helena Gaspars. Analiza czasowo-kosztowa (CPM-COST). Algorytm a model optymalizacyjny , 2006 .
[8] Chris Hendrickson,et al. Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders , 1989 .
[9] Erik Demeulemeester,et al. Discrete time/cost trade-offs in project scheduling with time-switch constraints , 2002, J. Oper. Res. Soc..
[10] S. K. Goyal. Note---A Note on “A Simple CPM Time-Cost Tradeoff Algorithm” , 1975 .
[11] N. R. Achuthan,et al. Project Scheduling under Time Dependent Costs – A Branch and Bound Algorithm , 2001, Ann. Oper. Res..
[12] Wallace B. S. Crowston,et al. Decision CPM: A Method for Simultaneous Planning, Scheduling, and Control of Projects , 1967, Oper. Res..
[13] Mario Vanhoucke,et al. The discrete time/cost trade-off problem: extensions and heuristic procedures , 2007 .