Computational Optimization of Manufacturing Batch Size and Shipment for an Integrated EPQ Model with Scrap

This paper employs mathematical modeling and algebraic approach to derive the optimal manufacturing batch size and number of shipment for a vendor-buyer integrated economic production quantity (EPQ) model with scrap. Unlike the conventional method by using differential calculus to determine replenishment lot size and optimal number of shipments for such an integrated system, this paper proposes a straightforward algebraic approach to replace the use of calculus on the total cost function for solving the optimal production- shipment policies. A simpler form for computing long-run average cost for such a vendor- buyer integrated EPQ problem is also provided.

[1]  Chi Bin Cheng,et al.  Optimal production-shipment decisions for the finite production rate model with scrap , 2009 .

[2]  Singa Wang Chiu,et al.  Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method , 2006 .

[3]  Dennis E. Blumenfeld,et al.  Production system design for quality robustness , 2008 .

[4]  Dennis L. Bricker,et al.  ANALYSIS OF A MARKOV CHAIN MODEL OF A MULTISTAGE MANUFACTURING SYSTEM WITH INSPECTION, REJECTION, AND REWORK , 1993 .

[5]  Singa Wang Chiu Production run time problem with machine breakdowns under AR control policy and rework , 2007 .

[6]  Singa Wang Chiu,et al.  Incorporating multi-delivery policy and quality assurance into economic production lot size problem , 2009 .

[7]  Robert W. Grubbström,et al.  The EOQ with backlogging derived without derivatives , 1999 .

[8]  Lu Lu A one-vendor multi-buyer integrated inventory model , 1995 .

[9]  Singa Wang Chiu,et al.  Mathematical Method for Expediting Scrap-or-Rework Decision Making in EPQ Model with Failure in Repair , 2008 .

[10]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[11]  Singa Wang Chiu,et al.  AN ALGEBRAIC APPROACH FOR DETERMINING THE OPTIMAL LOT SIZE FOR EPQ MODEL WITH REWORK PROCESS , 2010 .

[12]  Bhaba R. Sarker,et al.  Optimal manufacturing batch size with rework process at a single-stage production system , 2004, Comput. Ind. Eng..

[14]  L. B. Schwarz,et al.  Fill-Rate Optimization in a One-Warehouse N-Identical Retailer Distribution System , 1985 .

[15]  Ruhul A. Sarker,et al.  An optimal batch size for a production system operating under periodic delivery policy , 1999 .

[16]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[17]  Nidhal Rezg,et al.  Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level , 2006 .

[18]  Singa Wang Chiu,et al.  Robust planning in optimization for production system subject to random machine breakdown and failure in rework , 2010, Comput. Oper. Res..

[19]  Kamran Moinzadeh,et al.  Analysis of a production/inventory system subject to random disruptions , 1997 .

[20]  Moshe Eben-Chaime,et al.  The effect of discreteness in vendor-buyer relationships , 2004 .

[21]  Singa Wang Chiu,et al.  Production lot size problem with failure in repair and backlogging derived without derivatives , 2008, Eur. J. Oper. Res..

[22]  Singa Wang Chiu,et al.  Mathematical modeling for production system with backlogging and failure in repair , 2006 .

[23]  R. M. Hill,et al.  Another look at the single-vendor single-buyer integrated production-inventory problem , 2006 .

[24]  S. Viswanathan,et al.  Coordinating supply chain inventories through common replenishment epochs , 2001, Eur. J. Oper. Res..