Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups
暂无分享,去创建一个
Tangbin Xia | Lifeng Xi | Ershun Pan | Hanxin Feng | Changbai Tan | L. Xi | Tangbin Xia | E. Pan | Hanxin Feng | Changbai Tan
[1] Lifeng Xi,et al. A joint model of production scheduling and predictive maintenance for minimizing job tardiness , 2011, The International Journal of Advanced Manufacturing Technology.
[2] Swagatam Das,et al. A Discrete Inter-Species Cuckoo Search for flowshop scheduling problems , 2015, Comput. Oper. Res..
[3] Mostafa Zandieh,et al. Bi-objective group scheduling in hybrid flexible flowshop: A multi-phase approach , 2010, Expert Syst. Appl..
[4] Xianpeng Wang,et al. An Improved Particle Swarm Optimization Algorithm for the Hybrid Flowshop Scheduling to Minimize Total Weighted Completion Time in Process Industry , 2010, IEEE Transactions on Control Systems Technology.
[5] Rasaratnam Logendran,et al. Sequence-dependent group scheduling problems in flexible flow shops , 2006 .
[6] Ji-Bo Wang,et al. Group scheduling with deteriorating jobs and allotted resource under limited resource availability constraint , 2019 .
[7] Xin-She Yang,et al. Cuckoo Search via Lévy flights , 2009, 2009 World Congress on Nature & Biologically Inspired Computing (NaBIC).
[8] M. Zandieh,et al. Due windows group scheduling using an effective hybrid optimization approach , 2010 .
[9] Chelliah Sriskandarajah,et al. Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups , 2006, Comput. Oper. Res..
[10] Rasaratnam Logendran,et al. A comparison of local search algorithms with population-based algorithms in hybrid flow shop scheduling problems with realistic characteristics , 2016 .
[11] M. Selim Akturk,et al. Automated robotic assembly line design with unavailability periods and tool changes , 2016 .
[12] Lifeng Xi,et al. Joint optimization of flowshop sequence-dependent manufacturing cell scheduling and preventive maintenance , 2016, 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM).
[13] Rasaratnam Logendran,et al. Group scheduling in flexible flow shops , 2005 .
[14] C. Richard Cassady,et al. Integrating preventive maintenance planning and production scheduling for a single machine , 2005, IEEE Transactions on Reliability.
[15] Fariborz Jolai,et al. Integrating sequence-dependent group scheduling problem and preventive maintenance in flexible flow shops , 2015 .
[16] S.M.T. Fatemi Ghomi,et al. Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates , 2014 .
[17] Carlos Andrés,et al. Group technology in a hybrid flowshop environment: A case study , 2005, Eur. J. Oper. Res..
[18] Mostafa Zandieh,et al. An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times , 2011, J. Intell. Manuf..
[19] Rasaratnam Logendran,et al. Hybrid flow shop batching and scheduling with a bi-criteria objective , 2016 .
[20] Wenzhu Liao,et al. Multi-objective group scheduling optimization integrated with preventive maintenance , 2017 .
[21] Nasser Salmasi,et al. Makespan minimisation in flexible flowshop sequence-dependent group scheduling problem , 2013 .
[22] Mohsen Varmazyar,et al. Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem , 2015, Ann. Oper. Res..
[23] Babak Abbasi,et al. An efficient tabu search algorithm for flexible flow shop sequence-dependent group scheduling problems , 2012 .
[24] Abolfazl Adressi,et al. Solving group scheduling problem in no-wait flexible flowshop with random machine breakdown , 2016 .
[25] Tangbin Xia,et al. Imperfect preventive maintenance optimization for flexible flowshop manufacturing cells considering sequence-dependent group scheduling , 2018, Reliab. Eng. Syst. Saf..