Assessing the Accuracy of Expert-Based Decisions in Dispatching Ready Mixed Concrete
暂无分享,去创建一个
[1] A. Land,et al. An Automatic Method for Solving Discrete Programming Problems , 1960, 50 Years of Integer Programming.
[2] Chung-Wei Feng,et al. Optimizing the schedule of dispatching RMC trucks through genetic algorithms , 2004 .
[3] Boyd C. Paulson,et al. Systems analysis of technical advancement in earthmoving equipment , 2006 .
[4] Shangyao Yan,et al. An optimal scheduling model for ready mixed concrete supply with overtime considerations , 2007 .
[5] Uzay Kaymak,et al. Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete , 2007, Eur. J. Oper. Res..
[6] Shangyao Yan,et al. Production scheduling and truck dispatching of ready mixed concrete , 2008 .
[7] Erwin Pesch,et al. Analysis, modeling and solution of the concrete delivery problem , 2009, Eur. J. Oper. Res..
[8] Jenhung Wang,et al. Dispatching ready mixed concrete trucks under demand postponement and weight limit regulation , 2010 .
[9] Yang Zhang,et al. Vehicle scheduling and dispatching of ready mixed concrete , 2011, The Fourth International Workshop on Advanced Computational Intelligence.
[10] S. Travis Waller,et al. Scheduling Concrete Delivery Problems by a Robust Meta Heuristic Method , 2013, 2013 European Modelling Symposium.
[11] Claude Sammut,et al. Solving Ready-Mixed Concrete Delivery Problems: Evolutionary Comparison between Column Generation and Robust Genetic Algorithm , 2014 .