Integrating lotsizing, loading, and scheduling decisions in flexible flow shops
暂无分享,去创建一个
[1] Alistair Clark,et al. Optimization approximations for capacity constrained material requirements planning , 2003 .
[2] Günter Fandel,et al. Simultaneous lot sizing and scheduling for multi-product multi-level production , 2006 .
[3] Alf Kimms,et al. Multi-level, single-machine lot sizing and scheduling (with initial inventory) , 1996 .
[4] Zeger Degraeve,et al. Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches , 2004, Eur. J. Oper. Res..
[5] Alf Kimms,et al. Some insights into proportional lot sizing and scheduling , 1998, J. Oper. Res. Soc..
[6] G. Fontan,et al. MIP-BASED HEURISTICS FOR CAPACITATED LOTSIZING PROBLEMS , 2003 .
[7] Herbert Meyr,et al. The general lotsizing and scheduling problem , 1997 .
[8] Wu Zhang,et al. On practical resource allocation for production planning and scheduling with period overlapping setups , 1994 .
[9] G. Nemhauser,et al. Integer Programming , 2020 .
[10] A. Clark,et al. Rolling-horizon lot-sizing when set-up times are sequence-dependent , 2000 .
[11] John M. Wilson,et al. The capacitated lot sizing problem: a review of models and algorithms , 2003 .
[12] Alf Kimms,et al. Lot sizing and scheduling -- Survey and extensions , 1997 .
[13] Wilbert E. Wilhelm,et al. Scheduling and lot sizing with sequence-dependent setup: A literature review , 2006 .
[14] D. Klabjan,et al. Single machine multi-product capacitated lot sizing with sequence-dependent setups , 2007 .
[15] B. Karimi,et al. MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups , 2010 .
[16] G. D. Eppen,et al. Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition , 1987, Oper. Res..
[17] Mohammad Mohammadi,et al. Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups , 2010, J. Intell. Manuf..
[18] Horst Tempelmeier,et al. Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource , 2008 .
[19] Patrizia Beraldi,et al. Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs , 2008, Comput. Oper. Res..
[20] Alistair R. Clark,et al. Lot sizing and furnace scheduling in small foundries , 2008, Comput. Oper. Res..
[21] Alistair R. Clark,et al. Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups , 2007, J. Heuristics.
[22] Frank Werner,et al. A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria , 2009, Comput. Oper. Res..