The resource renting problem subject to temporal constraints
暂无分享,去创建一个
[1] Erik Demeulemeester,et al. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .
[2] Rolf H. Möhring,et al. Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time , 1984, Oper. Res..
[3] Rolf H. Möhring,et al. Scheduling project networks with resource constraints and time windows , 1988 .
[4] H. N. Ahuja. Construction performance control by networks , 1976 .
[5] Rainer Kolisch,et al. Benchmark instances for project scheduling problems , 1999 .
[6] Hartwig Nübel,et al. Minimierung der Ressourcenkosten für Projekte mit planungsabhängigen Zeitfenstern , 1999 .
[7] Philip M. Wolfe,et al. Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .
[8] Alf Kimms,et al. Optimization guided lower and upper bounds for the resource investment problem , 2001, J. Oper. Res. Soc..
[9] Robert B. Harris. Packing Method for Resource Leveling (PACK) , 1990 .
[10] Erik Demeulemeester,et al. Minimizing resource availability costs in time-limited project networks , 1995 .
[11] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[12] Klaus Neumann,et al. Active and stable project scheduling , 2000, Math. Methods Oper. Res..
[13] Erik Demeulemeester,et al. Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..
[14] Rainer Kolisch,et al. Project Scheduling under Resource Constraints: Efficient Heuristics for Several Problem Classes , 1995 .