A vagueness measure for concurrent engineering of manual assembly lines
暂无分享,去创建一个
[1] Waguih ElMaraghy,et al. Modelling of Manufacturing Systems Complexity , 2003 .
[2] Martin Manns,et al. Automated DHM Modeling for Integrated Alpha-Numeric and Geometric Assembly Planning , 2013 .
[3] Christopher M. Schlick,et al. Project dynamics and emergent complexity , 2013, Comput. Math. Organ. Theory.
[4] Mark A. Vonderembse,et al. Concurrent engineering and its consequences , 2001 .
[5] N. Rychtyckyj. Intelligent manufacturing applications at Ford Motor Company , 2005, NAFIPS 2005 - 2005 Annual Meeting of the North American Fuzzy Information Processing Society.
[6] Claudia Eckert,et al. Engineering change: an overview and perspective on the literature , 2011 .
[7] Xiaoou Li,et al. Measuring triggering-interactions complexity on active databases based on conditional colored petri nets , 2004, (ICEEE). 1st International Conference on Electrical and Electronics Engineering, 2004..
[8] George Chryssolouris,et al. Manufacturing Systems: Theory and Practice , 1992 .
[9] R. Khalid,et al. Progress in large-shared projects: Method for forecasting and optimizing project duration in a distributed project , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.
[10] O. Hauptman,et al. The influence of process concurrency on project outcomes in product development: an empirical study of cross-functional teams , 1996 .
[11] S. Jack Hu,et al. Modeling of Manufacturing Complexity in Mixed-Model Assembly Lines , 2006 .