A vagueness measure for concurrent engineering of manual assembly lines

AbstractIn concurrent engineering, uncertainty in process planning arises because product design remains unfinished. Common solutions involve staying vague or creating concrete but speculative plans. In this work, a vagueness measure for process descriptions is proposed. The proposed method employs a controlled natural language for process descriptions. The measure is applied to an automotive end assembly project. Results show that the vagueness measure in initial planning is correlated with the number of changes in both work task attributes and work task descriptions. Future applications could address optimisation of planning detail throughout concurrent process planning.

[1]  Waguih ElMaraghy,et al.  Modelling of Manufacturing Systems Complexity , 2003 .

[2]  Martin Manns,et al.  Automated DHM Modeling for Integrated Alpha-Numeric and Geometric Assembly Planning , 2013 .

[3]  Christopher M. Schlick,et al.  Project dynamics and emergent complexity , 2013, Comput. Math. Organ. Theory.

[4]  Mark A. Vonderembse,et al.  Concurrent engineering and its consequences , 2001 .

[5]  N. Rychtyckyj Intelligent manufacturing applications at Ford Motor Company , 2005, NAFIPS 2005 - 2005 Annual Meeting of the North American Fuzzy Information Processing Society.

[6]  Claudia Eckert,et al.  Engineering change: an overview and perspective on the literature , 2011 .

[7]  Xiaoou Li,et al.  Measuring triggering-interactions complexity on active databases based on conditional colored petri nets , 2004, (ICEEE). 1st International Conference on Electrical and Electronics Engineering, 2004..

[8]  George Chryssolouris,et al.  Manufacturing Systems: Theory and Practice , 1992 .

[9]  R. Khalid,et al.  Progress in large-shared projects: Method for forecasting and optimizing project duration in a distributed project , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.

[10]  O. Hauptman,et al.  The influence of process concurrency on project outcomes in product development: an empirical study of cross-functional teams , 1996 .

[11]  S. Jack Hu,et al.  Modeling of Manufacturing Complexity in Mixed-Model Assembly Lines , 2006 .