Environmental Risk Assessment System for Phosphogypsum Tailing Dams

This paper may be of particular interest to the readers as it provides a new environmental risk assessment system for phosphogypsum tailing dams. In this paper, we studied the phosphogypsum tailing dams which include characteristics of the pollution source, environmental risk characteristics and evaluation requirements to identify the applicable environmental risk assessment methods. Two analytical methods, that is, the analytic hierarchy process (AHP) and fuzzy logic, were used to handle the complexity of the environmental and nonquantitative data. Using our assessment method, different risk factors can be ranked according to their contributions to the environmental risk, thereby allowing the calculation of their relative priorities during decision making. Thus, environmental decision-makers can use this approach to develop alternative management strategies for proposed, ongoing, and completed PG tailing dams.

[1]  Ord,et al.  Guidelines for Ecological Risk Assessment , 2014 .

[2]  Yang-Guo Zhao,et al.  Application of the analytic hierarchy process to a sustainability assessment of coastal beach exploitation: a case study of the wind power projects on the coastal beaches of Yancheng, China. , 2013, Journal of environmental management.

[3]  Zhe Tian,et al.  Application of a trapezoidal fuzzy AHP method for work safety evaluation and early warning rating of hot and humid environments , 2012 .

[4]  Xu Ling,et al.  Present Situation of Comprehensive Utilization Technology of Industrial Solid Waste , 2012 .

[5]  E Topuz,et al.  Integration of environmental and human health risk assessment for industries using hazardous materials: a quantitative multi criteria approach for environmental decision makers. , 2011, Environment international.

[6]  Fanos Papanicolaou,et al.  Experimental and theoretical studies on physico-chemical parameters affecting the solubility of phosphogypsum. , 2009, Journal of environmental radioactivity.

[7]  F. Xia Health Risk Assessment:Case Study of a Brownfield Contaminated by POPs at Changzhou , 2008 .

[8]  E. Karami Appropriateness of farmers’ adoption of irrigation methods: The application of the AHP model , 2006 .

[9]  Zhiwei Lian,et al.  Hourly cooling load prediction by a combined forecasting model based on Analytic Hierarchy Process , 2004 .

[10]  P. Chapman,et al.  Conducting Ecological Risk Assessments of Inorganic Metals and Metalloids: Current Status , 2003 .

[11]  P. Chapman Ecological risk assessment (ERA) and hormesis. , 2002, The Science of the total environment.

[12]  Kevin Barraclough,et al.  I and i , 2001, BMJ : British Medical Journal.

[13]  Ord,et al.  Guidelines for Ecological Risk Assessment , 2014 .