Supply planning models for a remanufacturer under just-in-time manufacturing environment with reverse logistics
暂无分享,去创建一个
H. Neil Geismar | Milind Dawande | Chelliah Sriskandarajah | V. Daniel R. Guide | Kyung Sung Jung | V. Guide | C. Sriskandarajah | Milind Dawande | H. N. Geismar
[1] L. V. Wassenhove,et al. MANAGING PRODUCT RETURNS FOR REMANUFACTURING , 2001 .
[2] Irina Maslennikova,et al. Xerox's Approach to Sustainability , 2000, Interfaces.
[3] Gilvan C. Souza,et al. CAPACITATED REMANUFACTURING WITH SERVICE LEVEL CONSTRAINTS* , 2002 .
[4] Kevin J. Gaudette,et al. Remanufacturing: The next great opportunity for boosting US productivity , 2003 .
[5] Onur Kaya,et al. Incentive and production decisions for remanufacturing operations , 2010, Eur. J. Oper. Res..
[6] Milind Dawande,et al. On the Interaction between Demand Substitution and Production Changeovers , 2009, Manuf. Serv. Oper. Manag..
[7] Taiichi Ohno,et al. Toyota Production System : Beyond Large-Scale Production , 1988 .
[8] Luk N. Van Wassenhove,et al. Closed - Loop Supply Chain Models with Product Remanufacturing , 2004, Manag. Sci..
[9] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[10] Mark Ferguson. Strategic Issues in Closed-Loop Supply Chains with Remanufacturing , 2009 .
[11] Bob Doppelt,et al. Extended producer responsibility and product take-back: applications for the Pacific Northwest , 2001 .
[12] Brian K. Thorn,et al. Take it back , 2002 .
[13] Ndue Kanari,et al. End-of-life vehicle recycling in the european union , 2003 .
[14] V. Daniel R. Guide,et al. Optimal Order Quantities with Remanufacturing Across New Product Generations , 2006 .
[15] Luk N. Van Wassenhove,et al. The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles , 2007, Manag. Sci..
[16] John Crotty,et al. Greening the supply chain? The impact of take-back regulation on the UK automotive sector , 2006 .
[17] Ruud H. Teunter,et al. Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing , 2008, Eur. J. Oper. Res..
[18] Ruud H. Teunter,et al. Economic Lot Scheduling Problem with Returns , 2006 .
[19] Vedat Verter,et al. Coordination and Priority Decisions in Hybrid Manufacturing/Remanufacturing Systems , 2006 .
[20] Robert E. Tarjan,et al. One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties , 1988, Math. Oper. Res..
[21] Terry P. Harrison,et al. Special Section: Closed-Loop Supply Chains: Practice and Potential: The Challenge of Closed-Loop Supply Chains , 2003, Interfaces.
[22] Jian Yang,et al. A concave‐cost production planning problem with remanufacturing options , 2005 .
[23] V. Daniel R. Guide,et al. OR FORUM - The Evolution of Closed-Loop Supply Chain Research , 2009, Oper. Res..
[24] Jian Yang,et al. Economic Lot-Sizing with Remanufacturing Options , 2001 .
[25] Bongju Jeong,et al. Supply planning model for remanufacturing system in reverse logistics environment , 2006, Comput. Ind. Eng..
[26] Eng Kwang. Han. Managing product returns for remanufacturing , 2002 .
[27] Michael R. Galbreth,et al. Optimal Acquisition and Sorting Policies for Remanufacturing , 2006 .
[28] Mark E. Ferguson,et al. The Effect of Competition on Recovery Strategies , 2006 .
[29] Yongjian Li,et al. Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution , 2006, OR Spectr..
[30] Luk N. Van Wassenhove,et al. Remanufacturing as a Marketing Strategy , 2008, Manag. Sci..
[31] Atalay Atasu,et al. Lot Sizing for Optimal Collection and Use of Remanufacturable Returns over a Finite Life‐Cycle , 2006 .
[32] K. Inderfurth,et al. Production planning and control of closed-loop supply chains , 2001 .
[33] Erwin van der Laan,et al. Quantitative models for reverse logistics: A review , 1997 .
[34] V. Guide. Production planning and control for remanufacturing: industry practice and research needs , 2000 .
[35] V. Daniel R. Guide,et al. Building contingency planning for closed-loop supply chains with product recovery , 2003 .
[36] Jayashankar M. Swaminathan,et al. Managing New and Remanufactured Products , 2006, Manag. Sci..
[37] Robert U. Ayres,et al. Eco-efficiency, asset recovery and remanufacturing , 1997 .
[38] Michael R. Galbreth,et al. Optimal Acquisition Quantities in Remanufacturing with Condition Uncertainty , 2010 .
[39] Chelliah Sriskandarajah,et al. Supply chain scheduling: Just-in-time environment , 2008, Ann. Oper. Res..
[40] Gilvan C. Souza,et al. Delayed Differentiation for Multiple Lifecycle Products , 2013 .