Factors leading to construction projects' failure in Jordon

ABSTRACT The construction industry is contemplated as one of the most essential and supportive pillars of the business environment in Jordan. Notwithstanding, the construction industry continues to struggle to achieve higher levels of success. An increasing number of projects in the construction industry have failed. However, research on the causes of failure is scarce. Thus, this study aims to identify the main factors and causes for construction projects’ failure in Jordan. To fulfil the study objectives, 50 factors were recognized through a literature review and were categorized referring to Drewin's Open Conversion System; the most widely identified factors were assessed using complied data in a survey of construction industry contractors, consultant engineers and clients, and senior experts’ interviews in the sector. The results show that major factors leading to construction projects’ failure are related to the internal hierarchy of the system, especially that of the contractor.

[1]  Marly Monteiro de Carvalho,et al.  Project management and its effects on project success: Cross-country and cross-industry comparisons , 2015 .

[2]  Hemanta Doloi,et al.  Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects , 2013 .

[3]  Kam Jugdev,et al.  A Retrospective look at our Evolving Understanding of Project Success , 2005, IEEE Engineering Management Review.

[4]  Walid Belassi,et al.  A new framework for determining critical success/failure factors in projects , 1996 .

[5]  F. J. Drewin Construction productivity: Measurement and improvement through work study , 1982 .

[6]  C. S Lim,et al.  Criteria of project success: an exploratory re-examination , 1999 .

[7]  Ismail Abdul Rahman,et al.  Significant Factors Causing Cost Overruns in Large Construction Projects in Malaysia , 2013 .

[8]  Ayman H. Al-Momani,et al.  Construction delay: a quantitative analysis , 2000 .

[9]  Murat Gunduz,et al.  Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey , 2013 .

[10]  Kam Judgev Project management: the managerial process , 2010 .

[11]  Walter Fernandez,et al.  Success in IT projects: A matter of definition? , 2008 .

[12]  Robert V. Brill,et al.  Applied Statistics and Probability for Engineers , 2004, Technometrics.

[13]  Terry Cooke-Davies,et al.  The “real” success factors on projects , 2002 .

[14]  He Zhi,et al.  Risk management for overseas construction projects , 1995 .

[15]  Jeffrey K. Pinto,et al.  The causes of project failure , 1990 .

[16]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .

[17]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[18]  Lavagnon A. Ika Project Success as a Topic in Project Management Journals , 2009 .

[19]  Ivars Avots Why Does Project Management Fail? , 1969 .

[20]  Nabil Kartam,et al.  Impact of construction materials on project time and cost in Kuwait , 2004 .

[21]  Lavagnon A. Ika Project Management for Development in Africa: Why Projects are Failing and What Can be Done about It , 2012 .

[22]  Ghaleb J. Sweis,et al.  Factors Affecting Contractor Performance on Public Construction Projects , 2014 .

[23]  Mohan M. Kumaraswamy,et al.  Unveiling relationships between contractor inputs and performance outputs , 2012 .

[24]  Martin Skitmore,et al.  Causes of delays in Saudi Arabian public sector construction projects , 2009 .

[25]  Mohan M. Kumaraswamy,et al.  Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .

[26]  Larry G. Crowley,et al.  Risk Assessment of Competitive Procurement , 1995 .

[27]  Fahad Saud Allahaim,et al.  Causes of cost overruns on infrastructure projects in Saudi Arabia , 2015 .

[28]  David Baccarini,et al.  The Logical Framework Method for Defining Project Success , 1999 .

[29]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[30]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[31]  Garold D. Oberlender,et al.  Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .

[32]  E. Westerveld,et al.  The Project Excellence Model®: linking success criteria and critical success factors , 2003 .

[33]  Hesham A. Bassioni,et al.  Causes of Delay in Building Construction Projects in Egypt , 2008 .

[34]  Ofer Zwikael,et al.  Evaluating the quality of project planning: a model and field results , 2004 .

[35]  John Wateridge,et al.  How can IS/IT projects be measured for success? , 1998 .

[36]  Mohammed Al-Khalil,et al.  Important causes of delay in public utility projects in Saudi Arabia , 1999 .

[37]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[38]  Essam Zaneldin,et al.  Construction claims in United Arab Emirates: Types, causes, and frequency , 2006 .

[39]  Faisal Manzoor Arain,et al.  The potential effects of variation orders on institutional building projects , 2005 .

[40]  Long Le-Hoai,et al.  Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .

[41]  Naomi J. Brookes,et al.  A critical argument in favor of theoretical pluralism: Project failure and the many and varied limitations of project management , 2014 .

[42]  John Messner,et al.  Comparing procurement methods for design-build projects , 2006 .

[43]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[44]  R. Ryan Nelson,et al.  Project Retrospectives: Evaluating Project Success, Failure, and Everything in Between , 2005, MIS Q. Executive.

[45]  Nashwan Dawood,et al.  Comparative study of delay factors in Libyan and the UK construction industry , 2012 .

[46]  Shamsul Sahibuddin,et al.  Critical success factors for software projects: A comparative study , 2011 .

[47]  E. Larson,et al.  Project Management: The Managerial Process , 2002 .

[48]  Søren L. Buhl,et al.  What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.

[49]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .