Control System for Railway Train Loading Station at Caofeidian Iron Ore Wharf

Integrating with the project of railway train loading station at Caofeidian Iron Ore Wharf,the design principles for the configuration of the control system and the selections of the programmable logic controller(PLC),control network,control modes,program editing software,interlocking control,colour graphic processor(CGP),devices for the protection of the belt conveyors,ITV system and paging system are expounded.Which will provide the reference for the design of similar works in the future.