Auction-based approach to resolve the scheduling problem in the steel making process
暂无分享,去创建一个
Manoj Kumar Tiwari | Felix T.S. Chan | Shashi Kumar | Vikas Kumar | F. Chan | M. Tiwari | Prof Vikas Kumar | S. Kumar
[1] Yoav Shoham,et al. Taming the Computational Complexity of Combinatorial Auctions: Optimal and Approximate Approaches , 1999, IJCAI.
[2] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[3] Guus Schreiber,et al. Knowledge Engineering and Management: The CommonKADS Methodology , 1999 .
[4] Sanjay B. Joshi,et al. Auction-based distributed scheduling in a dynamic job shop environment , 2002 .
[5] M. Numao,et al. A scheduling environment for steel-making processes , 1989, [1989] Proceedings. The Fifth Conference on Artificial Intelligence Applications.
[6] Rene Victor Valqui Vidal,et al. Inter-process synchronization in steel production , 1992 .
[7] D. A. Wismer,et al. A mixed integer programming model for scheduling orders in a steel mill , 1974 .
[8] M. C. Brown. The dynamic rescheduler: conquering the changing production environment , 1988, [1988] Proceedings. The Fourth Conference on Artificial Intelligence Applications.
[9] Lixin Tang,et al. A mathematical programming model for scheduling steelmaking-continuous casting production , 2000, Eur. J. Oper. Res..
[10] Masayuki Numao,et al. Cooperative scheduling and its application to steelmaking processes , 1991 .
[11] Stuart Brown,et al. Process Planning for Aluminum Tubes: An Engineering-Operations Perspective , 1996, Oper. Res..
[12] Yeong-Dae Kim,et al. A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules , 1998 .
[13] Jack Heller,et al. Some Numerical Experiments for an M × J Flow Shop and its Decision-Theoretical Aspects , 1960 .
[14] Peter I. Cowling,et al. Integration of continuous caster and hot strip mill planning for steel production , 2000 .
[15] Masayuki Numao,et al. Scheplan-a scheduling expert for steel-making process , 1988, Proceedings of the International Workshop on Artificial Intelligence for Industrial Applications.
[16] Kwangyeol Ryu,et al. Agent-based fractal architecture and modelling for developing distributed manufacturing systems , 2003 .
[17] J. Banks,et al. Allocating uncertain and unresponsive resources: an experimental approach. , 1989, The Rand journal of economics.
[18] Michael Jeng-Ping Shaw,et al. A distributed scheduling method for computer integrated manufacturing: the use of local area networks in cellular systems , 1987 .
[19] Ken-ichi Sato,et al. Hybridizing a Genetic Algorithm with Rule-Based Reasoning for Production Planning , 1995, IEEE Expert.
[20] Soundar Kumara,et al. A Cascading Auction Protocol as a Framework for Integrating Process Planning and Heterarchical Shop Floor Control , 1999 .
[21] Toru Ueda,et al. Development of integrated production scheduling system for iron and steel works , 1977 .
[22] Ronald M. Harstad,et al. Computationally Manageable Combinational Auctions , 1998 .
[23] Stephen F. Smith,et al. Constructing and Maintaining Detailed Production Plans: Investigations into the Development of Knowledge-Based Factory Scheduling Systems , 1986, AI Mag..
[24] R. Roy *,et al. Development of a knowledge model for managing schedule disturbance in steel-making , 2004 .
[25] Nigel Shadbolt,et al. Knowledge Engineering and Management , 2000 .
[26] Stephen F. Smith,et al. ISIS—a knowledge‐based system for factory scheduling , 1984 .
[27] Peter B. Luh,et al. Steel-making process scheduling using Lagrangian relaxation , 2002 .
[28] Li Pheng Khoo,et al. Agent-based multiple shop floor manufacturing scheduler , 2001 .
[29] Hiroshi Ishihara,et al. An Expert System of Automatic Slab Assignment for Hot Strip Mill , 1990 .