Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops

This paper investigates a particular integrated lotsizing and scheduling problem in a multi-level multi-product, multi-machine and flexible routes environment that is called flexible job shop problem (FJSP). The considered problem involves making simultaneous decision in sequencing operations, sizing lots and assigning machines to operations in order to optimize a multi-objective function including minimizing sum of the system costs, total machines workload and makespan, while a given demand is fulfilled without backlogging. Due to the complexity of the problem, a hybrid meta-heuristic based on a combination of Genetic algorithm and particle swarm optimization algorithm is developed to solve it. Additionally, the Taguchi method is employed to calibrate the influential parameters of the meta-heuristic and boost its capabilities. Finally, the performance of the proposed algorithm is compared with some well-known multi-objective algorithms such as NSGAII, SPEA2 and VEGA. Regarding to the computational results, the hybrid algorithm surpasses the other algorithms in the closeness of solutions to pareto optimal front and diversity criteria.

[1]  Herbert Jodlbauer,et al.  Equivalence classes of problem instances for a continuous-time lot sizing and scheduling problem , 2009, Eur. J. Oper. Res..

[2]  Mohammad Saidi-Mehrabad,et al.  MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints , 2013 .

[3]  P. Fattahi,et al.  A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem , 2015 .

[4]  Kalyanmoy Deb,et al.  A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..

[5]  Mohammad Saidi-Mehrabad,et al.  Integrated lot-sizing and scheduling with overlapping for multi-level capacitated production system , 2013, Int. J. Comput. Integr. Manuf..

[6]  Günter Fandel,et al.  Simultaneous lot sizing and scheduling for multi-product multi-level production , 2006 .

[7]  Safia Kedad-Sidhoum,et al.  Lagrangean Heuristic for a Multi-Plant Lot-Sizing Problem with Transfer and Storage Capacities , 2013, RAIRO Oper. Res..

[8]  Cemalettin Ozturk,et al.  Capacitated lot sizing with linked lots for general product structures in job shops , 2010, Comput. Ind. Eng..

[9]  John M. Wilson,et al.  The capacitated lot sizing problem: a review of models and algorithms , 2003 .

[10]  Sanja Petrovic,et al.  Fuzzy job shop scheduling with lot-sizing , 2008, Ann. Oper. Res..

[11]  Nasser Salmasi,et al.  Minimization of weighted earliness and tardiness for no-wait sequence-dependent setup times flowshop scheduling problem , 2013, Comput. Ind. Eng..

[12]  Alf Kimms,et al.  Lot Sizing and Scheduling with Sequence Dependent Setup Costs and Times and Efficient Rescheduling O , 2000 .

[13]  Stéphane Dauzère-Pérès,et al.  Solving the integrated lot-sizing and job-shop scheduling problem , 2014 .

[14]  Behrooz Karimi,et al.  Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: The finite horizon case , 2006, Appl. Math. Comput..

[15]  Ali Husseinzadeh Kashan,et al.  A discrete particle swarm optimization algorithm for scheduling parallel machines , 2009, Computers & industrial engineering.

[16]  Herbert Meyr,et al.  Combining the principles of variable neighborhood decomposition search and the fix&optimize heuristic to solve multi-level lot-sizing and scheduling problems , 2013, Comput. Oper. Res..

[17]  Riyaz Sikora,et al.  A genetic algorithm for integrating lot-sizing and sequencing in scheduling a capacitated flow line , 1996 .

[18]  L. V. Wassenhove,et al.  Multilevel capacitated lotsizing complexity and LP-based heuristics , 1991 .

[19]  Alistair Clark,et al.  Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line , 2011 .

[20]  Liang-Yuh Ouyang,et al.  A particle swarm optimization for solving joint pricing and lot-sizing problem with fluctuating demand and trade credit financing , 2011, Comput. Ind. Eng..

[21]  S. M. Seyedhoseini,et al.  Multi-period lot sizing and job shop scheduling with compressible process times for multilevel product structures , 2013 .

[22]  Patrizia Beraldi,et al.  Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs , 2008, Comput. Oper. Res..

[23]  Seyyed M. T. Fatemi Ghomi,et al.  Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines , 2007, Appl. Math. Comput..

[24]  Uday S. Karmarkar,et al.  The Deterministic Dynamic Product Cycling Problem , 1985, Oper. Res..

[25]  Amir Saman Kheirkhah,et al.  Two hybrid tabu search–firefly algorithms for the capacitated job shop scheduling problem with sequence-dependent setup cost , 2015, Int. J. Comput. Integr. Manuf..

[26]  Kalyanmoy Deb,et al.  Multi-objective optimization using evolutionary algorithms , 2001, Wiley-Interscience series in systems and optimization.

[27]  Mohammad Saidi-Mehrabad,et al.  Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system , 2013 .

[28]  C. F. Jeff Wu,et al.  Experiments , 2021, Wiley Series in Probability and Statistics.

[29]  Kenneth N. Brown,et al.  An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups , 2009 .

[30]  Ching-Lai Hwang,et al.  Multiple Attribute Decision Making: Methods and Applications - A State-of-the-Art Survey , 1981, Lecture Notes in Economics and Mathematical Systems.

[31]  Fuqing Zhao,et al.  An improved particle swarm optimisation with a linearly decreasing disturbance term for flow shop scheduling with limited buffers , 2014, Int. J. Comput. Integr. Manuf..

[32]  Ikou Kaku,et al.  Solving uncapacitated multilevel lot-sizing problems using a particle swarm optimization with flexible inertial weight , 2009, Comput. Math. Appl..

[33]  Waldemar Kaczmarczyk Proportional lot-sizing and scheduling problem with identical parallel machines , 2011 .

[34]  Safia Kedad-Sidhoum,et al.  MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs , 2007, RAIRO Oper. Res..

[35]  Hartmut Stadtler,et al.  Multi-level single machine lot-sizing and scheduling with zero lead times , 2011, Eur. J. Oper. Res..