Rammed Earth Structures: A Code of Practice
暂无分享,去创建一个
Part 1 Materials: soil water mixing and blending stabilization. Part 2 Formwork: formwork requirements formwork in use. Part 3 Groundworks: foundations rising damp protection to walls floors termite resistance. Part 4 Superstructure: compressive strength of walls density of walls water absorption of walls weather erosion of walls, Part 5 Stability: stability of walls - slenderness stability of walls - opening and lintels stability of walls - bonding. Part 6 Details and finishes: fixing and ties surface treatments service inserts walls, floors and health. Part 7 Earthquake areas: rammed walls in earthquakes areas.