The advanced distributed ramp metering system (ARMS)
暂无分享,去创建一个
[1] C J Messer. ADVANCED FREEWAY SYSTEM RAMP METERING STRATEGIES FOR TEXAS , 1993 .
[2] James Robinson,et al. RAMP METERING STATUS IN NORTH AMERICA. , 1989 .
[3] Nancy L. Nihan,et al. PROCEDURE FOR ESTIMATING FREEWAY TRIP TABLES , 1982 .
[4] J. Y. K. Luk,et al. Two traffic responsive area traffic control methods: SCAT and SCOOT , 1983 .
[5] Adolf D. May,et al. Traffic Flow Fundamentals , 1989 .
[6] M J Schofield,et al. Motorway access control: implementation and assessment of Britain's first ramp metering scheme , 1990 .
[7] W R McCasland. STUDY OF LOCAL RAMP CONTROL AT CULEBRA ENTRANCE RAMP ON THE SOUTHBOUND IH 10 FREEWAY IN SAN ANTONIO , 1974 .
[8] J A Wattleworth,et al. PEAK PERIOD ANALYSIS AND CONTROL OF A FREEWAY SYSTEM /WITH DISCUSSION/ , 1965 .
[9] Beverly A. Sanders,et al. An Asynchronous, Distributed Flow Control Algorithm for Rate Allocation in Computer Networks , 1988, IEEE Trans. Computers.
[10] Joseph A Wattleworth. PEAK-PERIOD CONTROL OF A FREEWAY SYSTEM : SOME THEORETICAL CONSIDERATIONS , 1963 .
[11] Thomas Urbanik,et al. The Advanced Distributed Ramp Metering System (ARMS): (Extended Abstract) * , 1994 .
[12] K. Bharath-Kumar,et al. A new approach to performance-oriented flow control , 1981, IEEE Trans. Commun..