Capacity Expansion in Non-Regulated Electricity Markets

Investment in new generation is not well understood in a deregulated environment. While 20 years of literature focused on capacity expansion in a regulated world it is only since 2001 that researchers examine the gaming aspect of investment in electricity generation. The natural representation of a capacity expansion game has two stages: first to determine the capacity and to choose the production afterwards. In some cases one stage games can be used to replace two stage games. In most cases they can’t.

[1]  R. Deneckere,et al.  Excess Capacity and Collusion , 1990 .

[2]  D. Newbery,et al.  Allocating Transmission to Mitigate Market Power in Electricity Networks , 2004 .

[3]  B. Hobbs,et al.  Strategic generation with conjectured transmission price responses in a mixed transmission pricing system-part I: formulation , 2004, IEEE Transactions on Power Systems.

[4]  A.F. Wals,et al.  Strategic generation with conjectured transmission price responses in a mixed transmission pricing system-part II: application , 2004, IEEE Transactions on Power Systems.

[5]  Yves Smeers,et al.  Inefficiencies in European Congestion Management Proposals , 2004 .

[6]  Benjamin F. Hobbs,et al.  Network-constrained Cournot models of liberalized electricity markets: the devil is in the details , 2005 .

[7]  David M. Kreps,et al.  Quantity Precommitment and Bertrand Competition Yield Cournot Outcomes , 1983 .

[8]  Felix Wu,et al.  A Game-Theoretic Model for Generation Expansion Planning: Problem Formulation and Numerical Comparisons , 2001, IEEE Power Engineering Review.

[9]  Jean Jaskold Gabszewicz,et al.  Demand fluctuations and capacity utilization under duopoly , 1997 .

[10]  J. Cardell Market power and strategic interaction in electricity networks , 1997 .

[11]  Frederic H. Murphy,et al.  Generation Capacity Expansion in Imperfectly Competitive Restructured Electricity Markets , 2005, Oper. Res..

[12]  Yves Smeers,et al.  Forward Markets May Not Decrease Market Power When Capacities are Endogenous , 2005 .

[13]  Pravin Varaiya,et al.  A Game-Theoretic Model for Generation Expansion Planning: Problem Formulation and Numerical Comparisons , 2001 .