Distinguishing investment changes in metro construction project based on a factor space algorithm
暂无分享,去创建一个
[1] Mohammad Hadi Charkhakan,et al. Identification of Changes Formation Scenarios in Construction projects Based on Changes Occurrence Paths Analysis , 2012 .
[2] Qing Liu,et al. A differential privacy protection scheme for sensitive big data in body sensor networks , 2016, Ann. des Télécommunications.
[3] Rupak Rauniar,et al. Organizational Integration for Product Development: The Effects on Glitches, On-Time Execution of Engineering Change Orders, and Market Success , 2010, Decis. Sci..
[4] Li Nai. Coal Mine Safety Evaluation Model Based on Quantum Genetic Algorithm , 2012 .
[5] Faisal Manzoor Arain,et al. IT-based approach for effective management of project changes: A change management system (CMS) , 2008, Adv. Eng. Informatics.
[6] Houbing Song,et al. A Temporal-Spatial Method for Group Detection, Locating and Tracking , 2016, IEEE Access.
[7] Zhifeng Zhao,et al. The Logistic Regression from the Viewpoint of the Factor Space Theory , 2017, Int. J. Comput. Commun. Control.
[8] Liu Haita. Reasoning model of causality analysis , 2015 .
[9] Ming Sun,et al. User survey: the benefits of an online collaborative contract change management system , 2010, J. Inf. Technol. Constr..
[10] Wang Peizhuan. Causality analysis in factor spaces , 2014 .
[11] Wang Hua-don. Improved factor analysis on factor spaces , 2015 .
[12] Abraham Kandel,et al. Concepts, rules, and fuzzy reasoning: a factor space approach , 1991, IEEE Trans. Syst. Man Cybern..
[13] C. William Ibbs. Quantitative Impacts of Project Change: Size Issues , 1997 .
[14] Ren Hong. Variation Controlling of Construction Contract Performing , 2004 .
[15] Martín Tanco,et al. Do companies with greater deployment of participation systems use Visual Management more extensively? An exploratory study , 2014 .
[16] Yang Li. Evaluation Method of Mine Ventilation System Based on Grey Relational and Support Vector Machine Model , 2013 .
[17] Wang Peizhuan. Factor spaces and factor data-bases , 2013 .
[18] Faisal Manzoor Arain,et al. Causes of variation orders in construction projects in the Gaza Strip , 2010 .
[19] Amr A. Oloufa,et al. Model for Quantifying the Impact of Change Orders on Project Cost for U.S. Roadwork Construction , 2010 .
[20] Ming Sun,et al. A benefit measurement framework for an online contract change management system , 2008 .
[21] Yang Ju-we. Safety analysis of coal mine disaster based on factor analysis , 2015 .
[22] Amr A Oloufa,et al. Reconciliation of Owner and Contractor Views in Heavy Construction Projects , 2008 .
[23] Zhong Yu-bin,et al. The FHSE model of software system for synthetic evaluating enterprising , 2005 .
[24] Zhao Bao-feng. On the AHP-fuzzy comprehensive evaluation of threatening degree caused by mining water floods , 2013 .
[25] Petra M. Bosch-Sijtsema,et al. Visual Management in Mid-sized Construction Design Projects☆ , 2015 .
[26] Enzo Baccarelli,et al. Energy-Efficient Adaptive Resource Management for Real-Time Vehicular Cloud Services , 2019, IEEE Transactions on Cloud Computing.