Distinguishing investment changes in metro construction project based on a factor space algorithm

Metro construction projects are characterized by long construction periods and complex construction procedures. Therefore, contract changes involve significant information. To control metro construction investment, a method to distinguish between contract changes and extract the key influencing factors is required. In this paper, contract change information is processed and analyzed based on space factors and factor base theory. Evaluation of the proposed method reveals the following. (1) The demonstrated approach is feasible for deductive to semantic reasoning to determine and describe the concepts related to contract changes. The contract changes for various metro construction projects can be distinguished and the key factors of these contract changes can be determined. (2) Under the conditions of object and factor collection, different concept grids can be obtained by sorting the diversity factors. It is found that the same factors are included in the concept grid of each object, but different factors are contained in the concept grid of the corresponding object. (3) The main factors causing investment changes for metro construction contracts include differences in geological conditions or force majeure and conflicts between professional interfaces. When additional attention is paid to change factors, contract changes can be controlled. The results of this study provide specific guidance for governments to control metro construction investment effectively.

[1]  Mohammad Hadi Charkhakan,et al.  Identification of Changes Formation Scenarios in Construction projects Based on Changes Occurrence Paths Analysis , 2012 .

[2]  Qing Liu,et al.  A differential privacy protection scheme for sensitive big data in body sensor networks , 2016, Ann. des Télécommunications.

[3]  Rupak Rauniar,et al.  Organizational Integration for Product Development: The Effects on Glitches, On-Time Execution of Engineering Change Orders, and Market Success , 2010, Decis. Sci..

[4]  Li Nai Coal Mine Safety Evaluation Model Based on Quantum Genetic Algorithm , 2012 .

[5]  Faisal Manzoor Arain,et al.  IT-based approach for effective management of project changes: A change management system (CMS) , 2008, Adv. Eng. Informatics.

[6]  Houbing Song,et al.  A Temporal-Spatial Method for Group Detection, Locating and Tracking , 2016, IEEE Access.

[7]  Zhifeng Zhao,et al.  The Logistic Regression from the Viewpoint of the Factor Space Theory , 2017, Int. J. Comput. Commun. Control.

[8]  Liu Haita Reasoning model of causality analysis , 2015 .

[9]  Ming Sun,et al.  User survey: the benefits of an online collaborative contract change management system , 2010, J. Inf. Technol. Constr..

[10]  Wang Peizhuan Causality analysis in factor spaces , 2014 .

[11]  Wang Hua-don Improved factor analysis on factor spaces , 2015 .

[12]  Abraham Kandel,et al.  Concepts, rules, and fuzzy reasoning: a factor space approach , 1991, IEEE Trans. Syst. Man Cybern..

[13]  C. William Ibbs Quantitative Impacts of Project Change: Size Issues , 1997 .

[14]  Ren Hong Variation Controlling of Construction Contract Performing , 2004 .

[15]  Martín Tanco,et al.  Do companies with greater deployment of participation systems use Visual Management more extensively? An exploratory study , 2014 .

[16]  Yang Li Evaluation Method of Mine Ventilation System Based on Grey Relational and Support Vector Machine Model , 2013 .

[17]  Wang Peizhuan Factor spaces and factor data-bases , 2013 .

[18]  Faisal Manzoor Arain,et al.  Causes of variation orders in construction projects in the Gaza Strip , 2010 .

[19]  Amr A. Oloufa,et al.  Model for Quantifying the Impact of Change Orders on Project Cost for U.S. Roadwork Construction , 2010 .

[20]  Ming Sun,et al.  A benefit measurement framework for an online contract change management system , 2008 .

[21]  Yang Ju-we Safety analysis of coal mine disaster based on factor analysis , 2015 .

[22]  Amr A Oloufa,et al.  Reconciliation of Owner and Contractor Views in Heavy Construction Projects , 2008 .

[23]  Zhong Yu-bin,et al.  The FHSE model of software system for synthetic evaluating enterprising , 2005 .

[24]  Zhao Bao-feng On the AHP-fuzzy comprehensive evaluation of threatening degree caused by mining water floods , 2013 .

[25]  Petra M. Bosch-Sijtsema,et al.  Visual Management in Mid-sized Construction Design Projects☆ , 2015 .

[26]  Enzo Baccarelli,et al.  Energy-Efficient Adaptive Resource Management for Real-Time Vehicular Cloud Services , 2019, IEEE Transactions on Cloud Computing.