A methodology based on benchmarking to learn across megaprojects: The case of nuclear decommissioning

Purpose The literature lacks a single and universally accepted definition of major and megaprojects: usually, these projects are described as projects with a budget above $1 billion and a high level of innovation, complexity, and uniqueness both in terms of physical infrastructure and stakeholder network. Moreover, they often provide fewer benefits than what were originally expected and are affected by delays and cost overruns. Despite this techno-economic magnitude, it is still extremely hard to gather lessons learned from these projects in a systematic way. The purpose of this paper is to present an innovative methodology based on benchmarking to investigate good and bad practices and learn from a portfolio of unique megaprojects. Design/methodology/approach The methodology combines quantitative and qualitative cross-comparison of case studies and statistical analysis into an iterative process. Findings Indeed, benchmarking offers significant potential to identify good and bad practices and improve the performance of project selection, planning, and delivery. Research limitations/implications The methodology is exemplified in this paper using the case of Nuclear Decommissioning Projects and Programmes (NDPs). Originality/value Indeed, due to their characteristics, NDPs can be addressed as megaprojects, and are a relevant example for the application of the methodology presented here that collects and investigates the characteristics that mostly impact the performance of (mega)projects, through a continuous learning process.

[1]  Naomi J. Brookes,et al.  Managing social challenges in the nuclear decommissioning industry: A responsible approach towards better performance , 2017 .

[2]  Giorgio Locatelli,et al.  Power plants as megaprojects: Using empirics to shape policy, planning, and construction management , 2015 .

[3]  Giorgio Locatelli,et al.  An island of constancy in a sea of change: rethinking project temporalities with long-term megaprojects , 2017 .

[4]  John R. Rossiter,et al.  The C-OAR-SE procedure for scale development in marketing , 2002 .

[5]  Robert C. Camp,et al.  Benchmarking: The Search for Industry Best Practices That Lead to Superior Performance , 1989 .

[6]  Kim S. Cameron,et al.  Making the Impossible Possible: Leading Extraordinary Performance: The Rocky Flats Story , 2006 .

[7]  Jonathon Shlens,et al.  A Tutorial on Principal Component Analysis , 2014, ArXiv.

[8]  Jean Hartley,et al.  Case study research , 2004 .

[9]  Luis F. Alarcón,et al.  Benchmarking System for Evaluating Management Practices in the Construction Industry , 2004 .

[10]  Gülçin Büyüközkan,et al.  Benchmarking process formalization and a case study , 1998 .

[11]  Paula Kyrö,et al.  Benchmarking as an action research process , 2004 .

[12]  C. Leach,et al.  Introduction to Statistics: A Non-parametric Approach for the Social Sciences , 1979 .

[13]  Naomi J. Brookes,et al.  Cost Overruns – Helping to Define What They Really Mean , 2018 .

[14]  D. Longbottom Benchmarking in the UK: an empirical study of practitioners and academics , 2000 .

[15]  S. Verweij Set-theoretic methods for the social sciences: a guide to qualitative comparative analysis , 2013 .

[16]  Daniel J. Solove A Taxonomy of Privacy , 2006 .

[17]  Tim Stapenhurst The benchmarking book : a how-to-guide to best practice for managers and practitioners , 2009 .

[18]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[19]  Mitchell J. Mergenthaler Introduction to statistics: A nonparametric approach , 1976 .

[20]  Giorgio Locatelli,et al.  Corruption in Public projects and Megaprojects: There is an elephant in the room! , 2017 .

[21]  C. Caldas,et al.  Benchmarking Initiatives in the Construction Industry: Lessons Learned and Improvement Opportunities , 2006 .

[22]  S. Foster Doing business research: a guide to theory and practice , 2012 .

[23]  Ian P. McCarthy,et al.  An evolutionary approach to benchmarking , 2001 .

[24]  B. Wee Large Infrastructure Projects: A Review of the Quality of Demand Forecasts and Cost Estimations , 2007 .

[25]  R. Edward Minchin,et al.  Management of Construction Firm Performance Using Benchmarking , 2007 .

[26]  Shankar Sankaran Industrial Megaprojects: Concepts, strategies and practices for success , 2016 .

[27]  Giorgio Locatelli,et al.  Project characteristics and performance in Europe: An empirical analysis for large transport infrastructure projects , 2017 .

[28]  G. Anand,et al.  Benchmarking the benchmarking models , 2008 .

[29]  Naomi Garnett,et al.  Benchmarking for construction: theory and practice , 2000 .

[30]  Deborah J. Fisher,et al.  Benchmarking in Construction Industry , 1995 .

[31]  G. Locatelli,et al.  Similar but Different: A Top-Down Benchmarking Approach to Investigate Nuclear Decommissioning Projects , 2017 .

[32]  S. Asmervik,et al.  Megaprojects and Risk. An Anatomy of Ambition , 2004 .

[33]  Naomi J. Brookes,et al.  The Successful Delivery of Megaprojects: A Novel Research Method , 2017 .

[34]  Naomi J. Brookes,et al.  How Benchmarking Can Support the Selection, Planning and Delivery of Nuclear Decommissioning Projects , 2017 .

[35]  R. Bagozzi,et al.  On the nature and direction of relationships between constructs and measures. , 2000, Psychological methods.