Notes on Feasibility and Optimality Conditions of Small-Scale Multifunction Robotic Cell Scheduling Problems With Pickup Restrictions
暂无分享,去创建一个
Kate Smith-Miles | Mehdi Foumani | M. Yousef Ibrahim | Indra Gunawan | K. Smith‐Miles | M. Foumani | I. Gunawan | M. Ibrahim
[1] Wieslaw Kubiak,et al. Sequencing of parts and robot moves in a robotic cell , 1989 .
[2] Pengyu Yan,et al. An algorithm for optimal cyclic scheduling in a robotic cell with flexible processing times , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.
[3] M. Yousef Ibrahim,et al. Cyclic scheduling in small-scale robotic cells served by a multi-function robot , 2013, IECON 2013 - 39th Annual Conference of the IEEE Industrial Electronics Society.
[4] Alessandro Agnetis,et al. Scheduling no-wait robotic cells with two and three machines , 2000, Eur. J. Oper. Res..
[5] H. Neil Geismar,et al. A note on productivity gains in flexible robotic cells , 2005 .
[6] Kouroush Jenab,et al. An Operation-Oriented Analysis of Hybrid robotic Cells , 2013, Int. J. Robotics Autom..
[7] Wai Kin Chan,et al. Optimal scheduling of k-unit production of cluster tools with single-blade robots , 2008, 2008 IEEE International Conference on Automation Science and Engineering.
[8] Robert P. Judd,et al. Max-plus-based mathematical formulation for cyclic permutation flow-shops , 2011, Int. J. Math. Model. Numer. Optimisation.
[9] Jeffrey B. Sidney,et al. Scheduling Multiple Parts in Two-Machine Dual-Gripper Robot Cells: Heuristic Algorithm and Performance Guarantee , 2004 .
[10] Kouroush Jenab,et al. Cycle time analysis in reentrant robotic cells with swap ability , 2012 .
[11] Neri Oxman,et al. Compound fabrication: A multi-functional robotic platform for digital design and fabrication , 2013 .
[12] Manuel M. Crisóstomo,et al. Intelligent Control and Integration Software for Flexible Manufacturing Cells , 2007, IEEE Transactions on Industrial Informatics.
[13] Chengbin Chu,et al. Cyclic multiple-robot scheduling with time-window constraints using a critical path approach , 2007, Eur. J. Oper. Res..
[14] Christian Bierwirth,et al. A heuristic scheduling procedure for multi-item hoist production lines , 2007 .
[15] Chelliah Sriskandarajah,et al. Scheduling in Dual Gripper Robotic Cells for Productivity Gains , 2001, IEEE Trans. Robotics Autom..
[16] Stjepan Bogdan,et al. Resource Allocation in Free-Choice Multiple Reentrant Manufacturing Systems Based on Machine-Job Incidence Matrix , 2011, IEEE Transactions on Industrial Informatics.
[17] Kouroush Jenab,et al. Analysis of flexible robotic cells with improved pure cycle , 2013, Int. J. Comput. Integr. Manuf..
[18] Gang Quan,et al. Feasibility Analysis for Temperature-Constraint Hard Real-Time Periodic Tasks , 2010, IEEE Transactions on Industrial Informatics.
[19] Yousef Ibrahim,et al. Scheduling rotationally arranged robotic cells served by a multi-function robot , 2014 .
[20] Gerd Finke,et al. Scheduling of coupled tasks and one-machine no-wait robotic cells , 2009, Comput. Oper. Res..