Minimization of maximum tardiness on unrelated parallel machines with process restrictions and setups
暂无分享,去创建一个
[1] Yih-Long Chang,et al. Heuristics for minimizing mean tardiness form parallel machines , 1991 .
[2] Bahram Alidaee,et al. Scheduling parallel machines to minimize total weighted and unweighted tardiness , 1997, Comput. Oper. Res..
[3] F. Frank Chen,et al. Unrelated parallel machine scheduling with setup times using simulated annealing , 2002 .
[4] V. Suresh,et al. Minimizing maximum tardiness for unrelated parallel machines , 1994 .
[5] V. Pan,et al. Parallel nested dissection for path algebra computations , 1986 .
[6] Fred Glover,et al. Tabu Search - Part II , 1989, INFORMS J. Comput..
[7] Y. Luo. Injection Moulding Product Application Activity Models , 2000 .
[8] Christos Koulamas,et al. The Total Tardiness Problem: Review and Extensions , 1994, Oper. Res..
[9] Jeng-Fung Chen,et al. Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints , 2006 .
[10] M. Azizoglu,et al. Tardiness minimization on parallel machines , 1998 .
[11] Young Hoon Lee,et al. Scheduling jobs on parallel machines applying neural network and heuristic rules , 2000 .
[12] Jeng-Fung Chen,et al. Unrelated parallel machine scheduling with secondary resource constraints , 2005 .
[13] Esther M. Arkin,et al. Weighted-Tardiness Scheduling on Parallel Machines with Proportional Weights , 1991, Oper. Res..
[14] A. Doğramaci. Production scheduling of independent jobs on parallel identical processors , 1984 .
[15] Vinícius Amaral Armentano,et al. Tabu search for scheduling on identical parallel machines to minimize mean tardiness , 2000, J. Intell. Manuf..
[16] C.-H. Kuo,et al. Evaluating scheduling heuristics for non-identical parallel processors , 1997 .
[17] K. R. Baker. Procedures for sequencing tasks with one resource type , 1973 .
[18] Christos Koulamas. Decomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problem , 1997 .
[19] Krishna R. Pattipati,et al. Schedule generation and reconfiguration for parallel machines , 1990, IEEE Trans. Robotics Autom..
[20] G. Dueck. New optimization heuristics , 1993 .
[21] Michael Pinedo,et al. Scheduling jobs on parallel machines with sequence-dependent setup times , 1997, Eur. J. Oper. Res..
[22] Hisashi Tamaki,et al. Application of search methods to scheduling problem in plastics forming plant: a binary representation approach , 1993, Proceedings of 32nd IEEE Conference on Decision and Control.
[23] Jae Kyung Shim,et al. Scheduling Jobs on Parallel Machines with Sequence-Dependent Family Set-up Times , 2002 .
[24] Alain Guinet. Scheduling independent jobs on uniform parallel machines to minimize tardiness criteria , 1995, J. Intell. Manuf..
[25] Chengbin Chu,et al. Parallel machine scheduling to minimize total tardiness , 2002 .
[26] Chris N. Potts,et al. A decomposition algorithm for the single machine total tardiness problem , 1982, Oper. Res. Lett..
[27] Julius Surkis,et al. Evaluation of a Heuristic for Scheduling Independent Jobs on Parallel Identical Processors , 1979 .
[28] Funda Sivrikaya-Serifoglu,et al. Parallel machine scheduling with earliness and tardiness penalties , 1999, Comput. Oper. Res..
[29] Johannes M.J. Schutten,et al. Parallel machine scheduling with release dates, due dates and family setup times , 1996 .