This paper describes the top-down value based transmission planning process for Eastern Wind Integration and Transmission Study (EWITS) with the consideration of large scale wind generation over the Eastern Interconnect footprint. Achieving 20% to 30% wind energy penetration across the Eastern Interconnect will require significant transmission infrastructure expansion. The transmission overlays developed for the EWITS high wind penetration scenarios consist of multiple 800kV HVDC and EHV AC lines with similar levels of new transmission and common elements. A brief look at cost perspective and carbon implications is provided as well.
[1] Liangying Hecker,et al. Joint Coordinated System Planning study conceptual transmission plans and the Wide Area Phasor Measurement System potential applications , 2009, 2009 IEEE/PES Power Systems Conference and Exposition.
[2] D. Osborn,et al. Value based transmission planning process for joint coordinated system plan , 2009, 2009 IEEE Power & Energy Society General Meeting.
[3] J. Lawhorn. Use of regional resource forecasts , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.