Quality self-control and co-supervision mechanism of construction agent in public investment project in China
暂无分享,去创建一个
Yan Zhang | Shuo Zhang | Yong Huang | Yunna Wu | Yunna Wu | Yong Huang | Shuo Zhang | Y. Zhang
[1] Pang Li-fan. Principle and Application of Multi-level and Comprehensive Fuzzy Evaluation Method for Quality of Building Engineering , 2009 .
[2] Ahmet Öztaş,et al. Development of quality matrix to measure the effectiveness of quality management systems in Turkish construction industry , 2007 .
[3] Wuyi Yue,et al. Dynamic risk management in petroleum project investment based on a variable precision rough set model , 2010 .
[4] Sangyoon Chin,et al. A process-based quality management information system , 2004 .
[5] Ling Yan,et al. Research frame for incentive mechanism of the construction Agent in government investment project: from the perspective of project governance , 2009, 2009 IEEE International Conference on Industrial Engineering and Engineering Management.
[6] Li Jinlong,et al. The group decision-making rules based on rough sets on large scale engineering emergency☆ , 2012 .
[7] Graham Winch,et al. Governing the project process: a conceptual framework , 2001 .
[8] Fang Zhi-geng. Process Evaluation of Construction Project Based on Dominance Rough Set Approach , 2009 .
[9] Yan Zhu,et al. Credit Assessment of Contractors: A Rough Set Method , 2006 .
[10] Donn E. Hancher,et al. Quality-Based Prequalification of Contractors , 2002 .
[11] Kin Keung Lai,et al. Variable precision rough set for group decision-making: An application , 2008, Int. J. Approx. Reason..
[12] F. Ling. How project managers can better control the performance of design-build projects , 2004 .
[13] Kun Zhou,et al. Feasibility Evaluation for Wind Power Generation Based on Rough Set Theory , 2011 .
[14] J. Turner,et al. Mechanisms of governance in the project-based organization:: Roles of the broker and steward , 2001 .