A two-phase approach for jointly determining the lot size and delivery policy in a vendor-buyer integrated system with rework
暂无分享,去创建一个
[1] Robert W. Grubbström,et al. The EOQ with backlogging derived without derivatives , 1999 .
[2] Yuan-Shyi Peter Chiu,et al. Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance , 2010 .
[3] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[4] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .
[5] Leroy B. Schwarz,et al. A Simple Continuous Review Deterministic One-Warehouse N-Retailer Inventory Problem , 1973 .
[6] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[7] Moshe Eben-Chaime,et al. The effect of discreteness in vendor-buyer relationships , 2004 .
[8] Sudeep Sarkar,et al. Optimal preventive maintenance in a production inventory system , 1999 .
[9] Yuan-Shyi Peter Chiu,et al. Solving an economic production lot size problem with multi-delivery policy and quality assurance using an algebraic approach , 2010 .
[10] Singa Wang Chiu,et al. Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns , 2007, Eur. J. Oper. Res..
[11] Yigal Gerchak,et al. The Structure of Periodic Review Policies in the Presence of Random Yield , 1990, Oper. Res..
[12] R. J. Tersine. Principles of inventory and materials management , 1982 .
[13] Y. Chiu. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .
[14] Roger M. Hill. Optimizing a Production System with a Fixed Delivery Schedule , 1996 .
[15] Yuan-Shyi Peter Chiu,et al. Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown , 2010, Comput. Math. Appl..