Delay and loss of productivity are the two main types of damage experienced by the contractor when the owner issues a change order. Courts have recognized critical path method schedule analysis as the preferred method of identifying and quantifying critical delays. As for the inefficiency damages, there is no direct way of measuring inefficiency due to its qualitative nature and the difficulty of linking the cause of the productivity loss to the damage. Most of the scholarly work published in this area was based on data supplied by the contractors; and that explains why there are discrepancies between what the contractor asks for and what the owner believes the contractor is entitled to. This study addresses the need for a statistical model to quantify the productivity loss from verifiable site data such as owner’s daily reports, change orders, drawings, and specifications, rather than rely solely on contractor surveys. A model is developed and validated to quantify the productivity loss in pipe work in r...
[1]
Jeffrey S. Russell,et al.
Impact of change orders on labor efficiency for electrical construction
,
1999
.
[2]
H. Keselman,et al.
Backward, forward and stepwise automated subset selection algorithms: Frequency of obtaining authentic and noise variables
,
1992
.
[3]
H. Randolph Thomas,et al.
Quantitative Effects of Construction Changes on Labor Productivity
,
1995
.
[4]
John J. Farbarik.
Discussion of “Quantitative Definition of Projects Impacted by Change Orders” by Awad S. Hanna, Richard Camlic, Pehr A. Peterson, and Erik V. Nordheim
,
2004
.
[5]
George Ossman.
Discussion of “Quantitative Definition of Projects Impacted by Change Orders” by Awad S. Hanna, Richard Camlic, Pehr A. Peterson, and Erik V. Nordheim
,
2004
.
[6]
Ali S. Hadi,et al.
Transformation of Variables
,
2006
.