The Overall Shift Device of the Derrick and the Finite Element Calculation

An overall shifting device was designed to move the drill as a whole, avoid the repeated assembly and disassembly of the cluster wells drill. The hydraulic system of the device and the strength of the loaded parts of the system was checked; The earth anchor, the size of the earth anchor was determined and ANSYS analysis were conducted to ensure its supporting function.