A study on product assembly and disassembly time prediction methodology based on virtual maintenance

Based on virtual maintenance, this paper aims to propose a time prediction method of assembly and disassembly (A&D) actions of product maintenance process to enhance existing methods’ prediction accuracy, applicability and efficiency.,First, a framework of A&D time prediction model is constructed, which describes the time prediction process in detail. Then, basic maintenance motions which can comprise a whole A&D process are classified into five categories: body movement, working posture change, upper limb movement, operation and grasp/placement. A standard posture library is developed based on the classification. Next, according to motion characteristics, different time prediction methods for each motion category are proposed based on virtual maintenance simulation, modular arrangement of predetermined time standard theory and the statistics acquired from motion experiment. Finally, time correction based on the quantitative evaluation method of motion time influence factors is studied so that A&D time could be predicted with more accuracy.,Case study of time prediction of products’ various A&D processes is conducted by implementing the proposed method. The prediction process of diesel cooling fan disassemble time is presented in detail. Through comparison, the advantages and effectiveness of the method are demonstrated.,This paper proposes a more accurate, efficient and applicable product A&D time prediction method. It can help designers predict A&D time of a product maintenance accurately in early design phases without a physical prototype. It can also provide basis for the verification of maintainability, the balance of the design of product structure and system layout.

[1]  Ying Li,et al.  Compensation-based methodology for maintenance time prediction in a virtual environment , 2014, Simul. Model. Pract. Theory.

[2]  Gaoliang Peng,et al.  A practical method for measuring product maintainability in a virtual environment , 2011 .

[3]  Zhang Liu GRASP-Based Maintenance Time and Man-Hour Model , 2002 .

[4]  Andrea F. Abate,et al.  A haptic-based approach to virtual training for aerospace industry , 2009, J. Vis. Lang. Comput..

[5]  Xu Jia,et al.  Using the swept volume to verify maintenance space in virtual environment , 2014 .

[6]  Dong Zhou,et al.  A maintenance time prediction method considering ergonomics through virtual reality simulation , 2016, SpringerPlus.

[7]  Joshua D. Summers,et al.  Manufacturing Assembly Time Estimation Using Structural Complexity Metric Trained Artificial Neural Networks , 2014, J. Comput. Inf. Sci. Eng..

[8]  Gianpaolo Francesco Trotta,et al.  Real time RULA assessment using Kinect v2 sensor. , 2017, Applied ergonomics.

[9]  Hao Hui-bing Research of Maintainability and Validation Methods in Armored Equipment Based on Virtual Maintenance , 2009 .

[10]  Gilberto Osorio-Gómez,et al.  Ergonomic analysis in conceptual design stage using a gesture-based modelling tool , 2017 .

[11]  X. F. Sun,et al.  Study on work improvement in a packaging machine manufacturing company , 2009, 2009 16th International Conference on Industrial Engineering and Engineering Management.

[12]  Xiumin Fan,et al.  Human factors automatic evaluation for entire maintenance processes in virtual environment , 2014 .

[13]  Helen Lockett,et al.  An Automated Maintainability Prediction Tool Integrated with Computer Aided Design , 2017 .

[14]  Bibhuti Bhusan Biswal,et al.  Influence of assembly predicate consideration on optimal assembly sequence generation , 2015 .

[15]  John Ahmet Erkoyuncu,et al.  Design of a Virtual Reality Framework for Maintainability and assemblability test of complex systems , 2015 .

[16]  Tingting Zhao Evolutionary Design Based on an Improved Genetic Algorithm and Generative Three-dimensional Shape , 2010 .

[17]  Youchao Sun Quantitative Evaluation Method of Product Disassembly Based on Parts Failure Rate and Disassembly Time , 2010 .

[18]  Amos H. C. Ng,et al.  Virtual manufacturing for press line monitoring and diagnostics , 2008 .

[19]  Amadou Coulibaly,et al.  Product modeling framework for behavioral performance evaluation at design stage , 2007, Comput. Ind..

[20]  Jaeil Park,et al.  Motion-based method for estimating time required to attach self-adhesive insulators , 2014, Comput. Aided Des..

[21]  Dong Zhou,et al.  A modeling approach for maintenance safety evaluation in a virtual maintenance environment , 2013, Comput. Aided Des..

[22]  Kang Le,et al.  A virtual reality‐based maintenance time measurement methodology for complex products , 2013 .

[23]  Xun Xu,et al.  Relationship matrix based automatic assembly sequence generation from a CAD model , 2013, Comput. Aided Des..

[24]  Joshua D. Summers,et al.  Assembly Time Estimation: Assembly Mate Based Structural Complexity Metric Predictive Modeling , 2014, J. Comput. Inf. Sci. Eng..

[25]  Sun You-chao Maintainability Assessment and Verification Technologies of Civil Aircraft in Virtual Environment , 2006 .

[26]  Jing-Rong Li,et al.  Interactive visualization of complex dynamic virtual environments for industrial assemblies , 2006, Comput. Ind..

[27]  Fouad Bennis,et al.  Predicting real-world ergonomic measurements by simulation in a virtual environment , 2011 .

[28]  Xu He,et al.  A desktop virtual reality‐based integrated system for complex product maintainability design and verification , 2010 .

[29]  Stephan Staudacher,et al.  Systematic simulation based approach for the identification and implementation of a scheduling rule in the aircraft engine maintenance , 2014 .

[30]  Uma Jayaram,et al.  Introducing quantitative analysis methods into virtual environments for real-time and continuous ergonomic evaluations , 2006, Comput. Ind..

[31]  Sun Li,et al.  Research on the time quota of transmission gear based on MOD , 2010, The 2nd International Conference on Information Science and Engineering.

[32]  Liu Wen-jian Research on the Maintainability Information Model Based on VR , 2010 .

[33]  Svetan Ratchev,et al.  Virtual Ergonomics and Time Optimization of a Railway Coach Assembly Line , 2012 .

[34]  Wen Tang,et al.  A real-time 3D motion planning and simulation scheme for nonholonomic systems , 2011, Simul. Model. Pract. Theory.

[35]  Nie Cheng-long Maintenance-flow-diagram-based Maintenance Time Simulation , 2005 .

[36]  David W. Rosen,et al.  Virtual prototyping in simultaneous product/process design for disassembly , 1998 .

[37]  Dong Zhou,et al.  A method for integrating ergonomics analysis into maintainability design in a virtual environment , 2016 .

[38]  Adelaide Marzano,et al.  Improving MTM-UAS to predetermine automotive maintenance times , 2012 .