A New Method for Control of Sustained Over-Voltage During the Early Stages of Power System Restoration

The control strategy of sustained over-voltage during the early stages of power system restoration is studied and a new method is presented in the paper. According to the results of load flow calculation and sensitivity analysis, the method applies expert system technique and non linear programming in turn to solve the control scheme of sustained over-voltage for each target bus. Differences between the early stages of restoration and the normal condition of power system are taken into account. A test to the IEEE 39-bus New England system is included to show effectiveness of the method.

[1]  Daniel Lindenmeyer,et al.  A framework for power system restoration , 2000 .

[2]  K. Mamandur Emergency Adjustments to Var Control Variables to Alleviate Over-Voltages, Under-Voltages,and Generator Var Limit Violations , 1982, IEEE Transactions on Power Apparatus and Systems.

[3]  Abbas Ketabi,et al.  An approach for optimal units start-up during bulk power system restoration , 2001, LESCOPE 01. 2001 Large Engineering Systems Conference on Power Engineering. Conference Proceedings. Theme: Powering Beyond 2001 (Cat. No.01ex490).

[4]  Z. Xu,et al.  A method for sustained overvoltage control during power system restoration , 2004, IEEE PES Power Systems Conference and Exposition, 2004..

[5]  Zhou Ming Survey of power system restoration control , 2007 .

[6]  M.M. Adibi,et al.  Overvoltage Control During Restoration , 1992, IEEE Power Engineering Review.

[7]  J.M. Miller,et al.  Special Considerations in Power System Restoration , 1992, IEEE Power Engineering Review.

[8]  P. Duggan,et al.  Some considerations in the development of restoration plans for electric utilities serving large metropolitan areas , 2006, IEEE Transactions on Power Systems.

[9]  A. Gomez Exposito,et al.  Sensitivity-based reactive power control for voltage profile improvement , 1993 .

[10]  Om P. Malik,et al.  An expert system for voltage and reactive power control of a power system , 1988 .

[11]  A. Benge,et al.  Simulation of the start-up of a Hydro Power plant for the emergency power supply of a nuclear power station , 2001 .

[12]  Chen-Ching Liu,et al.  An Expert System Assisting Decision-Making of Reactive Power/Voltage Control , 1986, IEEE Power Engineering Review.

[13]  Ivan Bratko,et al.  Prolog Programming for Artificial Intelligence , 1986 .

[14]  M. M. Adibi,et al.  Energizing high and extra-high voltage lines during restoration , 1999 .

[15]  Cheng Gai-hon A METHOD TO CONTROL SUSTAINED OVERVOLTAGE DURING POWER SYSTEM RESTORATION , 2004 .