Robust energy planning in buildings with energy and comfort costs
暂无分享,去创建一个
[1] Marcel Mongeau,et al. Event-based MILP models for resource-constrained project scheduling problems , 2011, Comput. Oper. Res..
[2] Nathan Mendes,et al. Predictive controllers for thermal comfort optimization and energy savings , 2008 .
[3] J. M. Pinto,et al. A Continuous Time Mixed Integer Linear Programming Model for Short Term Scheduling of Multistage Batch Plants , 1995 .
[4] Han-Lin Li,et al. A robust optimization model for stochastic logistic problems , 2000 .
[5] Pedro M. Castro,et al. An efficient MILP model for the short-term scheduling of single stage batch plants , 2006, Comput. Chem. Eng..
[6] J. M. House,et al. Optimal control of building and HVAC systems , 1995, Proceedings of 1995 American Control Conference - ACC'95.
[7] M. Newborough,et al. Influencing user behaviour with energy information display systems for intelligent homes , 2007 .
[8] Moncef Krarti,et al. Parametric analysis of active and passive building thermal storage utilization , 2005 .
[9] Stéphane Ploix,et al. A home automation system to improve household energy control , 2006 .
[10] Pierre Lopez,et al. Scheduling under energy constraints , 2009 .
[11] John M. Mulvey,et al. A New Scenario Decomposition Method for Large-Scale Stochastic Optimization , 1995, Oper. Res..
[12] Duy Long Ha,et al. An approach for home load Energy Management problem in uncertain context , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.
[13] Bernard Roy,et al. Robustness in operational research and decision aiding: A multi-faceted issue , 2010, Eur. J. Oper. Res..
[14] John R. King,et al. Production Scheduling , 1988, Computer-Aided Production Management.
[15] Ignacio E. Grossmann,et al. An Alternate MILP Model for Short-Term Scheduling of Batch Plants with Preordering Constraints , 1996 .
[16] Melvyn Sim,et al. The Price of Robustness , 2004, Oper. Res..
[17] Luis M. Serra,et al. Structure optimization of energy supply systems in tertiary sector buildings , 2009 .
[18] Ramón Alvarez-Valdés Olaguíbel,et al. The project scheduling polyhedron: Dimension, facets and lifting theorems , 1993 .
[19] Duy Long Ha,et al. Un système avancé de gestion d'énergie dans le bâtiment pour coordonner production et consommation. (An advanced system of power management to coordinate production and consumption in buildings) , 2007 .
[20] Jean-Charles Billaut,et al. Flexibility and Robustness in Scheduling , 2008 .
[21] V. Maniezzo,et al. An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation , 1998 .
[22] Pedro J. Mago,et al. Analysis and optimization of CCHP systems based on energy, economical, and environmental considerations , 2009 .
[23] Ignacio E. Grossmann,et al. Assignment and sequencing models for thescheduling of process systems , 1998, Ann. Oper. Res..
[24] Stéphane Ploix,et al. Smart Home - From User's Behavior to Prediction of Energy Consumption , 2010, ICINCO.