Operation challenges for fast-growing China ’ s hydropower systems and realization of energy saving and emission reduction

During the past two decades, in particular the past decade, there has been a rapid rate of development of hydropower in China. It is foreseeable that the same rate of development will be maintained in the next decade. The total installed generation capacity of hydropower in China has now surpassed 200GW and ranks first in the world. The unprecedented rate of expansion, development scale, emergence of large number of hydro plants with high head and huge capacity, and electric power transmission have led to significant changes in management and operation of large-scale hydropower systems which have become one of significant factors in constraining the security and economic operation of power grid in China. This article gives an overview of the China’s hydropower, analyzes the new challenges that it faces, highlights the key scientific and technological issues that need to be solved, and pinpoints that the solution of these problems will be the key to the realization of energy saving and emission reduction by China in 2020.

[1]  Slobodan P. Simonovic,et al.  Reservoir Systems Analysis: Closing Gap between Theory and Practice , 1992 .

[2]  R. Adapa,et al.  A review of selected optimal power flow literature to 1993. I. Nonlinear and quadratic programming approaches , 1999 .

[3]  Frank T.-C. Tsai,et al.  Optimization of Large-Scale Hydropower System Operations , 2003 .

[4]  John W. Labadie,et al.  Dynamic Optimal Unit Commitment and Loading in Hydropower Systems , 2003 .

[5]  B. R,et al.  Dynamic Programming in Hydropower Scheduling , 2012 .

[6]  Chuntian Cheng,et al.  Multiple criteria rainfall–runoff model calibration using a parallel genetic algorithm in a cluster of computers / Calage multi-critères en modélisation pluie–débit par un algorithme génétique parallèle mis en œuvre par une grappe d'ordinateurs , 2005 .

[7]  Chuntian Cheng,et al.  Knowledge management system on flow and water quality modeling , 2002, Expert Syst. Appl..

[8]  Chuntian Cheng,et al.  Optimizing Hydropower Reservoir Operation Using Hybrid Genetic Algorithm and Chaos , 2008 .

[9]  Ralph A. Wurbs Reservoir‐System Simulation and Optimization Models , 1993 .

[10]  R. Adapa,et al.  A review of selected optimal power flow literature to 1993. II. Newton, linear programming and interior point methods , 1999 .

[11]  Zheng Yan,et al.  Present situation and future prospect of hydropower in China , 2009 .

[12]  William W.-G. Yeh,et al.  Reservoir Management and Operations Models: A State‐of‐the‐Art Review , 1985 .

[13]  Guangtao Fu,et al.  A fuzzy optimization method for multicriteria decision making: An application to reservoir flood control operation , 2008, Expert Syst. Appl..

[14]  Ibrahim Yuksel,et al.  Hydropower for sustainable water and energy development , 2010 .

[15]  Chuntian Cheng,et al.  Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch , 2009 .

[16]  V.M.F. Mendes,et al.  Scheduling of Head-Sensitive Cascaded Hydro Systems: A Nonlinear Approach , 2009, IEEE Transactions on Power Systems.

[17]  John W. Labadie,et al.  Optimal Operation of Multireservoir Systems: State-of-the-Art Review , 2004 .

[18]  N. G. F. Sancho,et al.  A new algorithm for the solution of multi-state dynamic programming problems , 1975, Math. Program..

[19]  Wu Xinyu,et al.  Two Stage Particle Swarm Optimisation for Long-term Operation of a Hydroelectric Power System , 2009 .

[20]  M. E. El-Hawary,et al.  Optimal Economic Operation of Electric Power Systems , 2012 .