Productivity Gains in Flexible Robotic Cells
暂无分享,去创建一个
[1] Chelliah Sriskandarajah,et al. Scheduling in robotic cells , 1994 .
[2] Joe H. Mize,et al. Scheduling and control of flexible manufacturing systems: a critical review , 1994 .
[3] Yves Crama,et al. Cyclic scheduling in 3-machine robotic flow shops , 1999 .
[4] Chelliah Sriskandarajah,et al. Scheduling in Dual Gripper Robotic Cells for Productivity Gains , 2001, IEEE Trans. Robotics Autom..
[5] Kathryn E. Stecke,et al. Design, planning, scheduling, and control problems of flexible manufacturing systems , 1985 .
[6] Qi Su,et al. Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems , 1996, IEEE Trans. Robotics Autom..
[7] Wieslaw Kubiak,et al. Sequencing of parts and robot moves in a robotic cell , 1992 .
[8] H. Neil Geismar,et al. Sequencing and Scheduling in Robotic Cells: Recent Developments , 2005, J. Sched..
[9] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[10] Yves Crama,et al. Cyclic scheduling in robotic flowshops , 2000, Ann. Oper. Res..
[11] Werner Krabs,et al. Optimization and approximation , 1979 .
[12] H. Neil Geismar,et al. Dominance of Cyclic Solutions and Challenges in the Scheduling of Robotic Cells , 2005, SIAM Rev..
[13] Chelliah Sriskandarajah,et al. Scheduling in robotic cells: Complexity and steady state analysis , 1998, Eur. J. Oper. Res..
[14] C. Ray Asfahl. Robots and manufacturing automation , 1985 .
[15] Suresh P. Sethi,et al. Flexibility in manufacturing: A survey , 1990 .
[16] G. Finke,et al. Cycles and permutations in robotic cells , 2001 .
[17] C. M. Harmonosky,et al. Real-time scheduling in computer integrated manufacturing: a review of recent research , 1991 .
[18] Richard Kendall Miller. Fms/Cim Systems Integration Handbook , 1989 .
[19] Yves Crama,et al. Cyclic Scheduling of Identical Parts in a Robotic Cell , 1997, Oper. Res..
[20] Chelliah Sriskandarajah,et al. Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot , 2004, Oper. Res..
[21] Gerd Finke,et al. On A Conjecture About Robotic Cells: New Simplified Proof For The Three-Machine Case , 1999 .
[22] Ram Rachamadugu,et al. Classification and review of FMS scheduling procedures , 1994 .
[23] Chelliah Sriskandarajah,et al. Scheduling in Robotic Cells: Classification, Two and Three Machine Cells , 1997, Oper. Res..
[24] Chelliah Sriskandarajah,et al. Scheduling in Robotic Cells: Heuristics and Cell Design , 1999, Oper. Res..
[25] Chelliah Sriskandarajah,et al. Scheduling large robotic cells without buffers , 1998, Ann. Oper. Res..
[26] Ari K. Jónsson,et al. Cyclic Scheduling , 1999, IJCAI.
[27] Charles R. Standridge,et al. Modeling and Analysis of Manufacturing Systems , 1993 .