Algorithms for project scheduling with resource constraints

Abstract This paper presents heuristic algorithms for project scheduling and resource constraints. ROT, ROT-ACTIM, and ROT-ACTRES are three different criteria which are utilized in finding the minimum project duration under resource constraints. Comparisons of the project durations using the above criteria with those of GENRES, ACTIM, ACTRES, and TIMRES show that ROT-ACTIM and GENRES prove to be superior to other criteria.