Rubber-modified hot-mix asphalt pavement by dry process
暂无分享,去创建一个
F. Hernández-Olivares | B. Witoszek-Schultz | M. Alonso-Fernández | C. Benito-Moro | F. Hernández-Olivares | B. Witoszek-Schultz | M. Alonso-Fernández | C. Benito-Moro
[1] Cindy K Estakhri,et al. LABORATORY EVALUATION OF CRUMB RUBBER MODIFIED MIXTURES DESIGNED USING TXDOT MIXTURE DESIGN METHOD , 1995 .
[2] Andy Collop,et al. Absorption of Bitumen into Crumb Rubber Using the Basket Drainage Method , 2003 .
[3] Thomas Z1otkowski,et al. Report on the Status of Rubberized Asphalt Traffic Noise Reduction in Sacramento County , 1999 .
[4] Pedro Partal,et al. Thermo-rheological behaviour and storage stability of ground tire rubber-modified bitumens , 2004 .
[5] R G Hicks,et al. Asphalt rubber design and construction guidelines volume 1: design guidelines , 2002 .
[6] Serji N. Amirkhanian,et al. The influence of crumb rubber modifier (CRM) microstructures on the high temperature properties of CRM binders , 2005 .
[7] M. A. Mull,et al. Fracture resistance characterization of chemically modified crumb rubber asphalt pavement , 2002 .
[8] Leni Figueiredo Mathias Leite,et al. Rheological Studies of Asphalt with Ground Tire Rubber , 2001 .
[9] Gordon Airey,et al. Fundamental Binder and Practical Mixture Evaluation of Polymer Modified Bituminous Materials , 2004 .
[10] P. S. Wise,et al. Where the Rubber Hits the Road , 1994 .