An Intelligent Decision Support System for Part Launching in a Flexible Manufacturing System
暂无分享,去创建一个
[1] Albert Jones,et al. On-line concurrent simulation in production scheduling , 1989 .
[2] Oded Maimon,et al. Heuristics for dynamic selection and routing of parts in an FMS , 1992 .
[3] Andrew Kusiak,et al. Application of operational research models and techniques in flexible manufacturing systems , 1986 .
[4] Deborah J. Medeiros,et al. Real-time simulation for decision support in continuous flow manufacturing systems , 1992, WSC '92.
[5] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[6] Jean-Claude Gentina,et al. Coloured adaptive structured Petri-net: A tool for the automatic synthesis of hierarchical control of Flexible Manufacturing Systems (F.M.S.) , 1987, Proceedings. 1987 IEEE International Conference on Robotics and Automation.
[7] Joseph J. Talavage,et al. Intelligent dispatching for flexible manufacturing , 1991 .
[8] K. Preston White,et al. A recent survey of production scheduling , 1988, IEEE Trans. Syst. Man Cybern..
[9] Stephen C. Graves,et al. A Review of Production Scheduling , 1981, Oper. Res..
[10] F. Frank Chen,et al. Concurrent design of manufacturing cell and control functions: A neural network approach , 1995 .
[11] F. Frank Chen,et al. The state of the art in intelligent real-time FMS control: a comprehensive survey , 1996, J. Intell. Manuf..
[12] F. Frank Chen,et al. A framework for intelligent design of manufacturing cells , 1995, J. Intell. Manuf..
[13] Catherine Dupont-Gatelmand. A survey of flexible manufacturing systems , 1982 .
[14] He Jorge Haddock Senior Member. A Simulation Generator for Flexible Manufacturing Systems Design and Control , 1988 .
[15] Takashi Sekiguchi,et al. A timed Petri net and beam search based online FMS scheduling system with routing flexibility , 1991, Proceedings. 1991 IEEE International Conference on Robotics and Automation.
[16] R. Majapuro,et al. Modular control system with expert scheduling for flexible manufacturing , 1994, 1994 Proceedings of IEEE International Conference on Control and Applications.
[17] Ihsan Sabuncuoglu,et al. Expert simulation systems—recent developments and applications in flexible manufacturing systems , 1989 .
[18] Jeffrey S. Smith,et al. Discrete event simulation for shop floor control , 1994, Proceedings of Winter Simulation Conference.
[19] Jerry Banks,et al. DESIGN OF A KNOWLEDGE-BASED ON-LINE SIMULATION SYSTEM TO CONTROL A MANUFACTURING SHOP FLOOR , 1992 .
[20] C. R. Bector,et al. A review of scheduling rules in flexible manufacturing systems , 1989 .
[21] S. H. Huang,et al. Artificial neural networks in manufacturing: concepts, applications, and perspectives , 1994 .
[22] Kripa Shanker,et al. A loading and dispatching problem in a random flexible manufacturing system , 1985 .
[23] Paul Rogers,et al. Simulation for real-time decision making in manufacturing systems , 1993, WSC '93.
[24] Young-Hae Lee,et al. Part ordering through simulation-optimization in an FMS , 1991 .
[25] Gilmer L. Blankenship,et al. Realtime operations scheduling for flexible manufacturing systems , 1992, WSC '92.
[26] Richard A. Wysk,et al. Multi-pass expert control system - a control/scheduling structure for flexible manufacturing cells , 1988 .
[27] Gopal Kanji,et al. 100 Statistical Tests , 1994 .
[28] Kathryn E. Stecke,et al. Loading and control policies for a flexible manufacturing system , 1981 .
[29] Benoit Montreuil,et al. AN OBJECT-ORIENTED KNOWLEDGE REPRESENTATION FOR INTELLIGENT CONTROL OF MANUFACTURING WORKSTATIONS , 1994 .
[30] Joe H. Mize,et al. Scheduling and control of flexible manufacturing systems: a critical review , 1994 .
[31] Srini Ramaswamy,et al. Extended Petri net-based modeling, analysis and simulation of an intelligent materials handling system , 1994, J. Intell. Robotic Syst..
[32] Jerry Banks,et al. Real-time control of a manufacturing cell using knowledge-based simulation , 1991, 1991 Winter Simulation Conference Proceedings..
[33] Suresh K. Khator,et al. A survey of Petri net applications in modeling controls for automated manufacturing systems , 1994 .
[34] Stanley B. Gershwin,et al. Performance of hierarchical production scheduling policy , 1984 .
[35] C. Yano,et al. HEURISTIC APPROACHES FOR LOADING PROBLEMS IN FLEXIBLE MANUFACTURING SYSTEMS , 1993 .
[36] Albert Jones,et al. A hybrid approach for real-time sequencing and scheduling , 1995 .
[37] Ramarathnam Ravichandran,et al. Decision support in flexible manufacturing systems using timed Petri nets , 1986 .
[38] Robert E. Young,et al. Toward Knowledge-Based Control Of Flexible Manufacturing Systems , 1988 .
[39] C. M. Harmonosky,et al. Real-time scheduling in computer integrated manufacturing: a review of recent research , 1991 .
[40] Yuehwern Yih,et al. Development of a real-time learning scheduler using reinforcement learning concepts , 1994, Proceedings of 1994 9th IEEE International Symposium on Intelligent Control.
[41] Kang G. Shin,et al. Scheduling job operations in an automatic assembly line , 1990, Proceedings., IEEE International Conference on Robotics and Automation.
[42] J. S. Shang,et al. A neural network approach for the real time control of a FMS , 1994, 1994 Proceedings of the Twenty-Seventh Hawaii International Conference on System Sciences.
[43] Oded Maimon,et al. Dynamic Scheduling and Routing for Flexible Manufacturing Systems that Have Unreliable Machines , 1988, Oper. Res..
[44] F. F. Chen,et al. An effective part-selection model for production planning of flexible manufacturing systems , 1995 .