Bi-stakeholder Conflict Resolution-Based Layout of Construction Temporary Facilities in Large-Scale Construction Projects

Planning a layout of construction temporary facilities (CTFs), a specific construction site layout problem, is crucial to the successful completion of large-scale construction projects. Despite considerable research undertaken, mutual relationships and conflicts between the layout planner and other pre-planning task stakeholders (i.e., for the scheduling of construction activities or the material purchase) are not yet addressed in the layout process. Resolving conflicts is crucial to the layout optimization and this study is among the first to plan appropriate CTF layouts by taking bi-stakeholder conflict resolution into account. A new bi-level mathematical method is developed based on the resolution of conflicts between the CTF layout planner and the material purchase stakeholder, and thus providing an example for future layouts with bi-stakeholder conflicts. In this method, a bi-level programming model is first established to model layout-related goals, constraints, and conflicts. Second, a bi-level genetic algorithm is proposed to solve the model for appropriate layouts. To demonstrate the applicability of the proposed method, the method is applied to design a CTF layout for the construction of a practical dam project. The results demonstrated that an appropriate layout and a satisfactory purchase plan were determined, and conflicts between the CTF layout and the material purchase were prevented. The contributions of the method are the ability to capture the mutual conflicts of the CTF layout and the material purchase in the bi-level model, the capacity to develop a more efficient and realistic layout, and the practicality to guide planners in other situations.

[1]  Tarek Hegazy,et al.  DYNAMIC LAYOUT OF CONSTRUCTION TEMPORARY FACILITIES CONSIDERING SAFETY , 2004 .

[2]  Ichiro Nishizaki,et al.  Cooperative and Noncooperative Multi-Level Programming , 2009 .

[3]  Cees J. Gelderman,et al.  Handling measurement issues and strategic directions in Kraljic's purchasing portfolio model , 2003 .

[4]  Jian-Ping Zhang,et al.  4D dynamic construction management and visualization software: 1. Development , 2005 .

[5]  Jiuping Xu,et al.  A Decision Making System for Construction Temporary Facilities Layout Planning in Large-Scale Construction Projects , 2017 .

[6]  Jiuping Xu,et al.  Bilevel Optimization of Regional Water Resources Allocation Problem under Fuzzy Random Environment , 2013 .

[7]  Zhen Gao,et al.  A multi-objective model for purchasing of bulk raw materials of a large-scale integrated steel plant , 2003 .

[8]  Edward Allen,et al.  Fundamentals of Building Construction: Materials and Methods , 1985 .

[9]  Amalia Utamima,et al.  A comparative study of GA, PSO and ACO for solving construction site layout optimization , 2015 .

[10]  Stephan Dempe,et al.  Discrete bilevel programming: Application to a natural gas cash-out problem , 2005, Eur. J. Oper. Res..

[11]  Ka Chi Lam,et al.  Application of the entropy technique and genetic algorithms to construction site layout planning of medium‐size projects , 2005 .

[12]  Mahmoud A. Abo-Sinna,et al.  A multi-level non-linear multi-objective decision-making under fuzziness , 2004, Appl. Math. Comput..

[13]  Hesham Osman,et al.  A hybrid CAD-based construction site layout planning system using genetic algorithms , 2003 .

[14]  Yafeng Yin,et al.  Genetic-Algorithms-Based Approach for Bilevel Programming Models , 2000 .

[15]  David Rey,et al.  A multi-objective mixed integer nonlinear programming model for construction site layout planning to minimise noise pollution and transport costs , 2016 .

[16]  A. Horvath CONSTRUCTION MATERIALS AND THE ENVIRONMENT , 2004 .

[17]  R. J. Kuo,et al.  Application of particle swarm optimization algorithm for solving bi-level linear programming problem , 2009, Comput. Math. Appl..

[18]  Gao Zi-You,et al.  A bi-level programming model and solution algorithm for the location of logistics distribution centers , 2008 .

[19]  Byung-Soo Kim,et al.  Analysis of the CO2 emission characteristics of earthwork equipment , 2015 .

[20]  Mohsen Andayesh,et al.  The constructs of site layout modeling: an overview , 2015 .

[21]  Muhammad Jamaluddin Thaheem,et al.  Best Value Contractor Selection in Road Construction Projects: ANP-Based Decision Support System , 2018 .

[22]  Huibert Kwakernaak,et al.  Fuzzy random variables - I. definitions and theorems , 1978, Inf. Sci..

[23]  Laemthong Laokhongthavorn,et al.  A Multi-Objective Optimization Model for Solid Waste Disposal Under Uncertainty: A Case Study of Bangkok, Thailand , 2017 .

[24]  R. Sacks,et al.  An economic game theory model of subcontractor resource allocation behaviour , 2006 .

[25]  Ashraf Elazouni,et al.  D-sub : Decision support system for subcontracting construction works , 2000 .

[26]  Ka Chi Lam,et al.  Dynamic construction site layout planning using max-min ant system , 2010 .

[27]  Saeid Sabouri-Ghomi,et al.  Prediction of the Nonlinear Shear Response of the DBS , 2017 .

[28]  Jiuping Xu,et al.  Multi-objective dynamic layout problem for temporary construction facilities with unequal-area departments under fuzzy random environment , 2015, Knowl. Based Syst..

[29]  Lieyun Ding,et al.  A multi-attribute model for construction site layout using intuitionistic fuzzy logic , 2016 .

[30]  Zhonghua Yang,et al.  A Hybrid Optimal Model for Daily Reservoir Regulation Problem Under Fuzzy Random Environment , 2017 .

[31]  Simaan M. AbouRizk,et al.  Site Layout and Construction Plan Optimization Using an Integrated Genetic Algorithm Simulation Framework , 2017, J. Comput. Civ. Eng..

[32]  Min-Yuan Cheng,et al.  ArcSite: enhanced GIS for construction site layout , 1996 .

[33]  D. Sean McCone,et al.  Introduction to construction dispute resolution , 2003 .

[34]  Iraj Mohammadfam,et al.  Exploring Causal Factors on the Severity Rate of Occupational Accidents in Construction Worksites , 2017 .

[35]  Ali Shafaat,et al.  Decision-making Model by Specialty Subcontractors in Construction Projects , 2014 .

[36]  Rajkumar Roy,et al.  Bi-level optimisation using genetic algorithm , 2002, Proceedings 2002 IEEE International Conference on Artificial Intelligence Systems (ICAIS 2002).

[37]  Jiuping Xu,et al.  Suggestions for Temporary Construction Facilities’ Layout Problems in Large-Scale Construction Projects , 2014 .

[38]  Haidar M. Harmanani,et al.  Genetic Algorithm for Solving Site Layout Problem with Unequal-Size and Constrained Facilities , 2002 .

[39]  Ichiro Nishizaki,et al.  COMPUTATIONAL METHODS THROUGH GENETIC ALGORITHMS FOR OBTAINING STACKELBERG SOLUTIONS TO TWO-LEVEL MIXED ZERO-ONE PROGRAMMING PROBLEMS , 2000, Cybern. Syst..

[40]  S. R. Arora,et al.  Interactive fuzzy goal programming approach for bilevel programming problem , 2009, Eur. J. Oper. Res..

[41]  David Arditi,et al.  Issues in Subcontracting Practice , 2005 .