Project Management: Evaluation of the Problems in the Portuguese Construction Industry

During recent decades it has been possible to identify several problems in construction industry project management, related with to systematic failures in terms of fulfilling its schedule, cost and quality targets, which highlight a need for an evaluation of the factors that may cause these failures. Therefore, it is important to understand how project managers plan the projects, so that the performance and the results can be improved. However, it is important to understand if other areas beyond cost and time management that are mentioned on several studies as the most critical areas, receive the necessary attention from construction project managers. Despite the cost and time are the most sensitive areas/fields, there are several other factors that may lead to project failure. This study aims at understand the reasons that may cause the deviation in terms of cost, time and quality, from the project management point of view, looking at the knowledge areas mentioned by PMI (Project Management Institute).

[1]  Sergio Pellegrinelli,et al.  Programme management: organising project-based change , 1997 .

[2]  John Raftery,et al.  Risk Analysis in Project Management , 1993 .

[3]  Professora Auxiliar,et al.  Dissertação para obtenção do Grau de Mestre em Engenharia e Gestão Industrial , 2014 .

[4]  Sameh M. El-Sayegh,et al.  Significant factors causing delay in the UAE construction industry , 2006 .

[5]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[6]  J. Couto Study and analysis of the reasons for the lack of competitiveness of portuguese construction industry : implemented research surveys , 2006 .

[7]  Naresh K. Malhotra,et al.  Marketing Research: An Applied Orientation , 1993 .

[8]  David Arditi,et al.  Selecting a delay analysis method in resolving construction claims , 2006 .

[9]  William G Wells,et al.  An exploration of project management office features and their relationship to project performance , 2004 .

[10]  Ofer Zwikael,et al.  The Relative Importance of the PMBOK® Guide's Nine Knowledge Areas during Project Planning , 2009 .

[11]  Wail Menesi Construction Delay Analysis under Multiple Baseline Updates , 2007 .

[12]  Zofia K Rybkowski,et al.  Building evidence: using objective tools in construction project management. , 2011, Health facilities management.

[13]  J. P. Couto,et al.  As consequências do incumprimento dos prazos para a competitividade da indústria de construção : razões para os atrasos , 2005 .

[14]  Christophe Bredillet,et al.  Project management deployment: The role of cultural factors , 2009 .