A Comparison of the Suitability of FIDIC and NEC Conditions of Contract in Palestine
暂无分享,去创建一个
Margaret Emsley | Francis Fenn | Haytham Besaiso | David Wright | M. Emsley | Haytham Besaiso | D. Wright | F. Fenn
[1] N. El-Sawalhi,et al. An Overhead Costs Assessment for Construction Projects at Gaza Strip , 2015 .
[2] Michael D. Robinson,et al. A Contractor's Guide to the FIDIC Conditions of Contract: Robinson/A Contractor's Guide to the FIDIC Conditions of Contract , 2011 .
[3] Kathleen M. J. Harmon,et al. To Be or Not to Be—That Is the Question: Is a DRB Right for Your Project? , 2011 .
[4] Rosli Mohamad Zin,et al. A case study into the language structure of construction standard form in Malaysia , 2010 .
[5] M. Kumaraswamy,et al. Analysis of contractors’ bidding decision in the palestinian construction industry , 2010 .
[6] Onur Dursun,et al. Fidic’s Red Book 1999 edition: a study review , 2010 .
[7] Russell Kenley,et al. Construction Cost Management: Learning from Case Studies , 2010 .
[8] A. Jaeger,et al. FIDIC - A Guide for Practitioners , 2009 .
[9] Sherif Ali Mohtady Mohamed,et al. Problems associated with the process of claim management in Palestine: Contractors' perspective , 2009 .
[10] Rafiq M. Choudhry,et al. Contractors’ Perception towards Causes of Claims in Construction Projects , 2009 .
[11] Nii Ankrah,et al. The NEC Engineering and Construction Contract , 2008 .
[12] Will Hughes,et al. The engineer under FIDIC's conditions of contract for construction , 2007 .
[13] Peter Fenn,et al. Predicting Construction Disputes: An Aetiological Approach , 2007 .
[14] Brian Eggleston,et al. The NEC 3 Engineering and Construction Contract , 2006 .
[15] Melissa Yuet Li Chan,et al. New Engineering Contract (NEC) 1993 as radical changes to the Malaysian standard forms of contract , 2006 .
[16] Nael G. Bunni,et al. The FIDIC Forms of Contract , 2005 .
[17] Bryan M. Seifert. International Construction Dispute Adjudication under International Federation of Consulting Engineers Conditions of Contract and the Dispute Adjudication Board , 2005 .
[18] K. Kobayashi,et al. Bargaining model of construction dispute resolution , 2002, IEEE International Conference on Systems, Man and Cybernetics.
[19] W. Hughes,et al. Construction contract policy: do we mean what we say? , 2002 .
[20] Michael C. Vorster,et al. Innovations to Manage Disputes: DRB and NEC , 2000 .
[21] I. Ndekugri,et al. Differing site conditions risks: a FIDIC/engineering and construction contract comparison , 1999 .
[22] David Lowe,et al. Conflict and dispute in construction , 1997 .
[23] Jon C. Broome,et al. A comparison of the clarity of traditional construction contracts and of the New Engineering Contract , 1997 .
[24] Chen Lina,et al. Role of Engineer under FIDIC Form Contract , 1997 .
[25] Michael Frueh,et al. Plain English For Lawyers , 2016 .
[26] Sai On Cheung,et al. Anatomy of Construction Disputes , 2013 .
[27] Gabriel Swiney. The Dubious Upgrade of International Development Contracts , 2007 .
[28] Abdullah Murtaja. Investigation of FIDIC Clauses Dealing with Construction Project Performance , 2007 .
[29] S. Mohamed,et al. Causes of contractor's business failure in developing countries: the case of Palestine , 2006 .
[30] A. Abed,et al. AN INVESTIGATION OF DISPUTES RESOLUTION IN THE CONSTRUCTION INDUSTRY: THE CASE OF GAZA-STRIP , 2006 .
[31] Frances Forward. The NEC Compared and Contrasted , 2002 .
[32] A. Enshassi. Understanding Contract Documents and its relation to the Performance in Construction Projects , 1999 .