Performance-based pay factors for asphalt concrete construction: comparison with a currently used experience-based approach
暂无分享,去创建一个
[1] Paul E Benson. COMPARISON OF END RESULT AND METHOD SPECIFICATIONS FOR MANAGING QUALITY , 1995 .
[2] John T Harvey,et al. RECOMMENDED PERFORMANCE-RELATED SPECIFICATION FOR HOT-MIX ASPHALT CONSTRUCTION: RESULTS OF THE WESTRACK PROJECT , 2002 .
[3] Lorina Popescu,et al. Performance Specifications without Percent within Limits (PWLs); a Counter Point of View , 2006 .
[4] Carl L Monismith,et al. TEMPERATURE CONSIDERATIONS IN ASPHALT-AGGREGATE MIXTURE ANALYSIS AND DESIGN , 1994 .
[5] R B Leahy,et al. A RELIABILITY-BASED MIX DESIGN AND ANALYSIS SYSTEM FOR MITIGATING FATIGUE DISTRESS , 1997 .
[6] E C Granley. QUALITY ASSURANCE IN HIGHWAY CONSTRUCTION: PART IV - VARIATIONS OF BITUMINOUS CONSTRUCTION , 1969 .
[7] Jeffery Raphael Roesler,et al. CALTRANS ACCELERATED PAVEMENT TEST (CAL/APT) PROGRAM : SUMMARY REPORT : SIX YEAR PERIOD: 1994-2000 , 2000 .
[8] Charles W. Schwartz,et al. PERFORMANCE OF STONE MATRIX ASPHALT PAVEMENTS IN MARYLAND , 2003 .
[9] John T Harvey,et al. FATIGUE PERFORMANCE OF ASPHALT CONCRETE MIXES AND ITS RELATIONSHIP TO ASPHALT CONCRETE PAVEMENT PERFORMANCE IN CALIFORNIA , 1995 .
[10] John T Harvey,et al. Pay Factors for Asphalt-Concrete Construction: Effect of Construction Quality on Agency Costs , 2001 .
[11] Geoffrey M. Rowe,et al. Fatigue response of asphalt-aggregate mixtures , 1992 .