Solution of the Problem Supply Chain Management in Temporal Dependence

The article presents the problem of supply chain management. One of the main issues in solving such problems is routing. An algorithm to find the shortest path in the temporal dependence and fuzzy-defined parameters of time and distance. Solution is based on the apparatus of graph theory, namely fuzzy temporal graph. This algorithm is a modification of Dijkstra’s algorithm. An illustration of an example of solving the problem of finding an optimal route in fuzzy conditions, as such representation is closest to reality.

[1]  Vassilis Kostakos Temporal Graphs , 2014, Encyclopedia of Social Network Analysis and Mining.

[2]  James Evans,et al.  Optimization algorithms for networks and graphs , 1992 .