Addressing environmental and economic impacts of changeover operations through manufacturing strategies

A Changeover is the set of operations required to switch from producing one product to another and quite frequently it includes both setup and cleaning operations. Changeovers are especially critical for multi-product environments where flexibility, time and quality are key requirements of the manufacturing system. A range of environmental and economic impacts occur during changeover operations and often the magnitude and extent of these are not fully captured by manufacturing companies. This paper investigates the implication of manufacturing strategies that are related to changeover operations such as LEAN, TQM, JIT and TPM on changeover operations and the direction they may drive changeover operations in the future. Current results from recent case studies suggest that a part of the environmental and economic impacts from changeovers is within the scope of these manufacturing philosophies and could have been mitigated through comprehensive and successful implementation. However, this has been countered by the lack of information that connects the changeover impacts to the manufacturing strategies. This paper aims to address this gap.

[1]  Rosemary R. Fullerton,et al.  The production performance benefits from JIT implementation , 2001 .

[2]  Tarun Gupta,et al.  JIT and TQM: a case for joint implementation , 1995 .

[3]  Albert Canut,et al.  OzoneCip : Ozone Cleaning in Place in Food Industries , 2007 .

[4]  Hans Müller-Steinhagen,et al.  Problems and Costs due to Heat Exchanger Fouling in New Zealand Industries , 1993 .

[5]  Peter J. Fryer,et al.  A prototype cleaning map: A classification of industrial cleaning processes , 2009 .

[6]  A Ozbay,et al.  Cleaner production opportunity assessment for a milk processing facility. , 2007, Journal of environmental management.

[7]  Phillip T. Robbins,et al.  Current Knowledge in Hygienic Design: Can We Minimise Fouling and Speed Cleaning? , 2011 .

[8]  Michael R. Overcash,et al.  WASTE MINIMIZATION IN BATCH VESSEL CLEANING , 1993 .

[9]  Geraint W Owen,et al.  Changeover improvement: A maintenance perspective , 2001 .

[10]  Y. Sugimori,et al.  Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .

[11]  M. Terziovski,et al.  The relationship between total quality management practices and operational performance , 1999 .

[12]  Laura Grundemann,et al.  Cleaning waste minimization for multiproduct plants: transferring macro batch to micro conti manufacturing , 2012 .

[13]  Luis Puigjaner,et al.  Environmental considerations in batch production scheduling , 1995 .

[14]  Jens-Peter Majschak,et al.  Surface modifications – Application potential for the reduction of cleaning costs in the food processing industry , 2009 .

[15]  Andrew G. Livingston,et al.  Environmental impact considerations in the optimal design and scheduling of batch processes , 1997 .

[16]  R. Schroeder,et al.  Relationships between implementation of TQM, JIT, and TPM and manufacturing performance , 2001 .

[17]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[18]  L. Swanson Linking maintenance strategies to performance , 2001 .

[19]  L. Puigjaner,et al.  Focusing in by-product recovery and waste minimization in batch production scheduling , 1994 .

[20]  新郷 重夫,et al.  A revolution in manufacturing : the SMED system , 1985 .

[21]  Albert H. C. Tsang Strategic dimensions of maintenance management , 2002 .

[22]  Jesper Munksgaard,et al.  An environmental performance index for products reflecting damage costs , 2007 .

[23]  S. Snell,et al.  THE STRATEGIC USE OF INTEGRATED MANUFACTURING: AN EMPIRICAL EXAMINATION , 1996 .

[24]  R. Bharath Lead Time Reduction of Component Manufacturing Through Quick Changeover (QCO) , 2008 .

[25]  David Ian Wilson,et al.  Enhanced cleaning of whey protein soils using pulsed flows , 2000 .

[26]  Peter T. Ward,et al.  Lean manufacturing: context, practice bundles, and performance , 2003 .

[27]  Hendrik Van Landeghem,et al.  Rules for integrating fast changeover capabilities into new equipment design , 2002 .

[28]  Geraint W Owen,et al.  Set-up reduction (SUR) beyond total productive maintenance (TPM) , 1997 .