Simultaneous optimization of delay management decisions and passenger routes

The task of delay management is to decide whether connecting trains should wait for delayed feeder trains or depart on time in order to minimize the passengers’ delay. To estimate the effect of the wait-depart decisions on the travel times, most delay management models assume that passengers’ routes are predefined. However, in practice, passengers can adapt their routes to the wait-depart decisions and arising changes in the timetable. For this reason, in this paper we assume that passengers’ demand is given in form of pairs of origins and destinations (OD-pairs) and take wait-depart decisions and decisions on passengers’ routes simultaneously.This approach, called delay management with re-routing, was introduced in Dollevoet et al. (Transp. Sci. 46(1):74–89, 2012) and we build our research upon the results obtained there. We show that the delay management problem with re-routing is strongly NP-hard even if there is only one OD-pair. Furthermore, we prove that even if there are only two OD-pairs, the problem cannot be approximated with constant approximation ratio unless P=NP. However, for the case of only one OD-pair we propose a polynomial-time algorithm. We show that our algorithm finds an optimal solution if there is no reasonably short route from origin to destination which requires a passenger to enter the same train twice. Otherwise, the solution found by the algorithm is a 2-approximation of an optimal solution and the estimated travel time is a lower bound on the objective value.

[1]  Michiel A. Odijk,et al.  A CONSTRAINT GENERATION ALGORITHM FOR THE CONSTRUCTION OF PERIODIC RAILWAY TIMETABLES , 1996 .

[2]  Peter Widmayer,et al.  Railway Delay Management: Exploring Its Algorithmic Complexity , 2004, SWAT.

[3]  David S. Johnson,et al.  Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .

[4]  Belarmino Adenso-Díaz,et al.  On-line timetable re-scheduling in regional train services , 1999 .

[5]  Matthias Müller-Hannemann,et al.  The Price of Robustness in Timetable Information , 2011, ATMOS.

[6]  Leo Kroon,et al.  Algorithmic Methods for Railway Optimization, International Dagstuhl Workshop, Dagstuhl Castle, Germany, June 20-25, 2004, 4th International Workshop, ATMOS 2004, Bergen, Norway, September 16-17, 2004, Revised Selected Papers , 2007, ATMOS.

[7]  Dennis Huisman,et al.  Delay Management Including Capacities of Stations , 2015, Transp. Sci..

[8]  Karl Nachtigall,et al.  Simultaneous Network Line Planning and Traffic Assignment , 2008, ATMOS.

[9]  Peter Widmayer,et al.  Online Delay Management on a Single Train Line , 2004, ATMOS.

[10]  Marie Schmidt Integrating Routing Decisions in Network Problems , 2011, OR.

[11]  Leena Suhl,et al.  A note on the online nature of the railway delay management problem , 2011, Networks.

[12]  Sebastian Stiller,et al.  Online railway delay management: Hardness, simulation and computation , 2011, Simul..

[13]  Leena Suhl,et al.  Requirement for, and Design of, an Operations Control System for Railways , 1999 .

[14]  Matthias Ehrgott,et al.  Railway track allocation: models and methods , 2011, OR Spectr..

[15]  Marie Schmidt,et al.  The Complexity of Integrating Routing Decisions in Public Transportation Models , 2010, ATMOS.

[16]  Rolf H. Möhring,et al.  The Concept of Recoverable Robustness, Linear Programming Recovery, and Railway Applications , 2009, Robust and Online Large-Scale Optimization.

[17]  Sven Oliver Krumke,et al.  Extensions to online delay management on a single train line: new bounds for delay minimization and profit maximization , 2011, Math. Methods Oper. Res..

[18]  Matteo Fischetti,et al.  Light Robustness , 2009, Robust and Online Large-Scale Optimization.

[19]  Walter Ukovich,et al.  A Mathematical Model for Periodic Scheduling Problems , 1989, SIAM J. Discret. Math..

[20]  Dario Pacciarelli,et al.  Bi-objective conflict detection and resolution in railway traffic management , 2012 .

[21]  Anita Schöbel,et al.  To Wait or Not to Wait - And Who Goes First? Delay Management with Priority Decisions , 2010, Transp. Sci..

[22]  Ralf Borndörfer,et al.  Discrete Optimization in Public Transportation , 2009 .

[23]  Leon Peeters,et al.  The Computational Complexity of Delay Management , 2005, WG.

[24]  Mark Hickman,et al.  Computer-aided Systems in Public Transport , 2008 .

[25]  Marc E. Pfetsch,et al.  Models for fare planning in public transport , 2012, Discret. Appl. Math..

[26]  Paolo Toth,et al.  A Survey of Optimization Models for Train Routing and Scheduling , 1998, Transp. Sci..

[27]  Leena Suhl,et al.  Design of Customer-oriented Dispatching Support for Railways , 2001 .

[28]  Dennis Huisman,et al.  Delay Management with Rerouting of Passengers , 2012, Transp. Sci..

[29]  Rolf H. Möhring,et al.  Robust and Online Large-Scale Optimization: Models and Techniques for Transportation Systems , 2009, Robust and Online Large-Scale Optimization.

[30]  Anita Schöbel,et al.  To Wait or Not to Wait? The Bicriteria Delay Management Problem in Public Transportation , 2007, Transp. Sci..

[31]  Rob M.P. Goverde,et al.  The Max-plus Algebra Approach To RailwayTimetable Design , 1998 .

[32]  Anita Schöbel,et al.  A Bicriteria Approach for Robust Timetabling , 2009, Robust and Online Large-Scale Optimization.

[33]  K. Nachtigall Periodic network optimizationi and fixed interval timetables , 1999 .

[34]  Stefan Voß,et al.  Computer-Aided Scheduling of Public Transport , 2001 .

[35]  Martin Desrochers,et al.  Computer-Aided Transit Scheduling , 1992 .

[36]  Leena Suhl,et al.  Managing and Preventing Delays in Railway Traffic by Simulation and Optimization , 2001 .

[37]  Martine Labbé,et al.  Optimization models for the single delay management problem in public transportation , 2008, Eur. J. Oper. Res..

[38]  Reinhard Bauer Theory and engineering for shortest paths and delay management , 2010 .

[39]  Anita Schöbel,et al.  Integer Programming Approaches for Solving the Delay Management Problem , 2004, ATMOS.

[40]  B. Schutter,et al.  On max-algebraic models for transportation networks , 1998 .

[41]  Martin Grötschel,et al.  Konrad-zuse-zentrum Für Informationstechnik Berlin Models for Line Planning in Public Transport Models for Line Planning in Public Transport * , 2022 .

[42]  Matteo Fischetti,et al.  Fast Approaches to Improve the Robustness of a Railway Timetable , 2009, Transp. Sci..

[43]  Dennis Huisman,et al.  Delay Management with Re-Routing of Passengers , 2010, ATMOS.

[44]  Anita Schöbel,et al.  A Model for the Delay Management Problem based on Mixed-Integer-Programming , 2001, ATMOS.

[45]  Bernd Heidergott,et al.  Towards a (Max,+) Control Theory for Public Transportation Networks , 2001, Discret. Event Dyn. Syst..

[46]  Anita Schöbel,et al.  An Empirical Analysis of Robustness Concepts for Timetabling , 2010, ATMOS.

[47]  Anita Schöbel,et al.  Optimization in Public Transportation - Stop Location, Delay Management and Tariff Zone Design in a Public Transportation Network , 2006, Optimization and its applications.

[48]  Rob M.P. Goverde,et al.  Railway Timetable Stability Analysis Using Max-plus System Theory , 2007 .

[49]  Anita Schöbel,et al.  Line Planning with Minimal Traveling Time , 2005, ATMOS.

[50]  Jarkko Niittymäki,et al.  Mathematical methods on optimization in transportation systems , 2001 .