The locomotive assignment problem: a survey on optimization models
暂无分享,去创建一个
[1] Panos M. Pardalos,et al. Approximate dynamic programming: solving the curses of dimensionality , 2009, Optim. Methods Softw..
[2] Jian Liu,et al. Real-life locomotive planning: New formulations and computational results , 2008 .
[3] Ravindra K. Ahuja,et al. Network Models in Railroad Planning and Scheduling , 2005 .
[4] Warren B. Powell,et al. Dynamic-Programming Approximations for Stochastic Time-Staged Integer Multicommodity-Flow Problems , 2006, INFORMS J. Comput..
[5] Md Al-Amin,et al. Production of locomotive rosters for a multi-class single-locomotive problem , 1999, J. Oper. Res. Soc..
[6] Warren B. Powell,et al. Approximate dynamic programming for rail operations , 2007, ATMOS.
[7] William T. Ziemba,et al. Applications of Stochastic Programming (Mps-Siam Series on Optimization) (Mps-Saimseries on Optimization) , 2005 .
[8] Warren B. Powell,et al. An Adaptive Dynamic Programming Algorithm for the Heterogeneous Resource Allocation Problem , 2002, Transp. Sci..
[9] Peter Brucker,et al. Routing of Railway Carriages , 2003, J. Glob. Optim..
[10] Michael Forbes,et al. Exact Solution of Locomotive Scheduling Problems , 1991 .
[11] Jacques Desrosiers,et al. OPERATIONAL CAR ASSIGNMENT AT VIA RAIL CANADA , 2000 .
[12] Adriano Baceler,et al. An Optimization Approach to the Locomotive Scheduling Problem in Brazilian Railways , 2006 .
[13] Jean-François Cordeau,et al. A Benders Decomposition Approach for the Locomotive and Car Assignment Problem , 1998, Transp. Sci..
[14] Warren B. Powell,et al. Stochastic Programming in Transportation and Logistics , 2003 .
[15] Fabian Zurbuchen,et al. Production of locomotive rosters for a multi-class multi-locomotive problem , 2003 .
[16] Naoto Fukumura,et al. Real-time freight locomotive rescheduling and uncovered train detection during disruption , 2012, Eur. J. Oper. Res..
[17] Mauro Birattari,et al. A multi-objective ant colony optimization method applied to switch engine scheduling in railroad yards , 2010 .
[18] Warren B. Powell,et al. Approximate Dynamic Programming for Locomotive Optimization , 2010 .
[19] Jacques Desrosiers,et al. A Branch-First, Cut-Second Approach for Locomotive Assignment , 1998 .
[20] Warren B. Powell,et al. Strategic, Tactical and Real-Time Planning of Locomotives at Norfolk Southern Using Approximate Dynamic Programming , 2012 .
[21] Armin Fügenschuh,et al. Scheduling Locomotives and Car Transfers in Freight Transport , 2008, Transp. Sci..
[22] Sylvie Gélinas,et al. Locomotive assignment with heterogeneous consists at CN North America , 1997 .
[23] Paolo Toth,et al. A Survey of Optimization Models for Train Routing and Scheduling , 1998, Transp. Sci..
[24] Uwe T. Zimmermann,et al. Engine Routing and Scheduling at Industrial In-Plant Railroads , 2003, Transp. Sci..
[25] Warren B. Powell,et al. Dynamic Models of Transportation Operations , 2003, Supply Chain Management.
[26] B. Biller. Approximate Dynamic Programming for High-Dimensional Problems , 2008 .
[27] Jian Liu,et al. Solving Real-Life Locomotive-Scheduling Problems , 2005, Transp. Sci..
[28] Armin Fügenschuh,et al. Locomotive and Wagon Scheduling in Freight Transport , 2006, ATMOS.
[29] Abraham Charnes,et al. A MODEL FOR THE OPTIMAL PROGRAMMING OF RAILWAY FREIGHT TRAIN MOVEMENTS , 1956 .
[30] Balachandran Vaidyanathan,et al. The Locomotive Routing Problem , 2008, Transp. Sci..
[31] J. M. P. Booler,et al. The Solution of a Railway Locomotive Scheduling Problem , 1980 .
[32] G. Maróti,et al. Maintenance Routing for Train Units: The Transition Model , 2005, Transp. Sci..
[33] Sanjeev R. Kulkarni,et al. Combining cost-based and rule-based knowledge in complex resource allocation problems , 2006 .
[34] Michael Florian,et al. The Engine Scheduling Problem in a Railway Network Part I , 1973 .
[35] Warren B. Powell,et al. Dynamic Models for Freight Transportation , 2007 .
[36] J. M. P. Booler,et al. A Note on the Use of Lagrangean Relaxation in Railway Scheduling , 1995 .
[37] Louis S Thompson. Conclusions: Competitive Tendering in Railways – What Can We Learn from Experience? , 2007 .
[38] Michael Florian,et al. The engine scheduling problem in a railway network , 1976 .
[39] Warren B. Powell,et al. Capturing incomplete information in resource allocation problems through numerical patterns , 2009, Eur. J. Oper. Res..
[40] Jean-François Cordeau,et al. SIMULTANEOUS LOCOMOTIVE AND CAR ASSIGNMENT AT VIA RAIL CANADA , 1998 .
[41] Keivan Ghoseiri,et al. A hybrid genetic algorithm for multi-depot homogenous locomotive assignment with time windows , 2010, Appl. Soft Comput..
[42] Per Olov Lindberg,et al. Railway Timetabling Using Lagrangian Relaxation , 1998, Transp. Sci..
[43] Warren B. Powell,et al. Approximate Dynamic Programming - Solving the Curses of Dimensionality , 2007 .
[44] Warren B. Powell,et al. A Representational Paradigm for Dynamic Resource Transformation Problems , 2001, Ann. Oper. Res..
[45] Hassan Chizari,et al. LOCOMOTIVE OPTIMIZATION USING ARTIFICIAL INTELLIGENCE APPROACH , 2005 .
[46] Tibor Illés,et al. Combinatorial Optimization Model for Railway Engine Assignment Problem , 2005, ATMOS.
[47] Zsuzsanna Vaik,et al. Railway engine assignment models based on combinatorial and integer programming , 2005 .
[48] Phil Ireland,et al. The Canadian Pacific Railway Transforms Operations by Using Models to Develop Its Operating Plans , 2004, Interfaces.
[49] B. Paoletti,et al. The Optimization Model for Locomotive Rostering in the Fleet Planning Project , 2006, The Proceedings of the Multiconference on "Computational Engineering in Systems Applications".
[50] Volker Scholtz. Knowledge-based Locomotive Planning for the Swedish Railway , 2000 .
[51] K. V. Ramani. An Information System for Allocating Coach Stock on Indian Railways , 1981 .
[52] Mike Wright. Applying Stochastic Algorithms to a Locomotive Scheduling Problem , 1989 .