The terrain scanning methodology, Assessing and improving construction supply chains

Abstract The terrain scanning methodology (TSM) can be used to provide an insight into supply chain proficiency. Taking a holistic viewpoint, it assesses individual business processes and whole supply chains. Building on previous research in a variety of market sectors the TSM aims to minimise the resources needed in undertaking a diagnostic while allowing a high degree of scope. The application of the methodology to a house building supply chain is described. Critical analysis of the method is undertaken. From the benefits realised the TSM is a vital initial step before embarking on a long term supply chain engineering programme.

[1]  Daniel Berry,et al.  The BPR SCOPE concept in leveraging improved supply chain performance , 1999, Bus. Process. Manag. J..

[2]  Peter E.D. Love,et al.  Concurrent engineering : a strategy for procuring construction projects , 1998 .

[3]  Mohamed Mohamed Naim,et al.  Identifying supply chain solutions: those suitable for the UK house building sector , 2001 .

[4]  John L. Burbidge Five golden rules to avoid bankruptcy , 1983 .

[5]  D. Towill Time compression and supply chain management ‐ a guided tour , 1996 .

[6]  Daniel M. Berry,et al.  A systems engineering approach to manufacturing systems analysis , 1998 .

[7]  Wickham Skinner,et al.  Manufacturing: The Formidable Competitive Weapon , 1985 .

[8]  Peter Guthrie,et al.  WASTE MINIMISATION AND RECYCLING IN CONSTRUCTION - A REVIEW , 1995 .

[9]  John E. Taylor,et al.  A model for logistics systems engineering management education in Europe , 2000 .

[10]  Nick Rich,et al.  The seven value stream mapping tools , 1997 .

[11]  J. Barlow,et al.  From Craft Production to Mass Customisation. Innovation Requirements for the UK Housebuilding Industry , 1999 .

[12]  Gautam Mitra,et al.  Supply Chain Planning Under Uncertainty , 1999 .

[13]  Edward R. Dougherty Editorial (January 1998) , 1998 .

[14]  Danny Berry,et al.  Pipeline Information Survey: a UK Perspective , 1998 .

[15]  Gregory H. Watson,et al.  Business systems engineering : managing breakthrough changes for productivity and profit , 1994 .

[16]  P. Love,et al.  Rework: a symptom of a dysfunctional supply-chain , 1999 .

[17]  Daniel R. Krause,et al.  Supplier Partnerships in Manufacturing Versus Non‐Manufacturing Firms , 1994 .

[18]  J. Barlow,et al.  Partnering, Lean Production and the High Performance Workplace , 1996 .

[19]  Vernon Ireland,et al.  T40—Radical time reduction in construction projects , 1996 .

[20]  David C. Brown,et al.  Working together: tools for an integrated construction supply chain , 1999 .

[21]  R. Maull,et al.  Business Process Re‐engineering , 1994 .