A Lot-sizing Model for Just-in-time Manufacturing
暂无分享,去创建一个
[1] Uday S. Karmarkar,et al. Batching to minimize flow times on one machine , 1987 .
[2] Michael J. Magazine,et al. Batching in single operation manufacturing systems , 1985 .
[3] W. Zangwill. From EOQ Towards ZI , 1987 .
[4] Evan L. Porteus,et al. Setup reduction and increased effective capacity , 1987 .
[5] Uday S. Karmarkar,et al. Lot Sizes, Lead Times and In-Process Inventories , 1987 .
[6] Hanan Luss,et al. Final assembly sequencing for just-in-time manufacturing , 1989 .
[7] Alan L. Saipe,et al. Production Runs for Multiple Products: The Two-Product Heuristic , 1977 .
[8] Jatinder N. D. Gupta,et al. Determining lot sizes and resource requirements: A review , 1987 .
[9] Thom J. Hodgson,et al. An N-Product, Multi-Machine, Lotsize Scheduling Model , 1973 .
[10] Lloyd A. Swanson,et al. A lot sizing and sequencing algorithm for dynamic demands upon a single facility , 1982 .
[11] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[12] Hanan Luss. Synchronized manufacturing at final assembly and feeder shops , 1989 .
[13] W. Maxwell,et al. The Effect of Restricting Cycle Times in the Economic Lot Scheduling Problem , 1983 .