Capacitated disassembly scheduling with random demand and operation time
暂无分享,去创建一个
Saurabh Pratap | Yandong He | Panpan Ma | Fuli Zhou | Ming K. Lim | F. Zhou | Yandong He | Panpan Ma | S. Pratap
[1] Y. Geng,et al. An overview of China’s recyclable waste recycling and recommendations for integrated solutions , 2018, Resources, Conservation and Recycling.
[2] Idiano D’Adamo,et al. Remanufacturing in industry: advices from the field , 2016 .
[3] Jing-Sheng Song,et al. Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty , 2000, Manuf. Serv. Oper. Manag..
[4] MengChu Zhou,et al. Scheduling Dual-Objective Stochastic Hybrid Flow Shop With Deteriorating Jobs via Bi-Population Evolutionary Algorithm , 2020, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[5] Ming Li,et al. Due date assignment and dynamic scheduling of one-of-a-kind assembly production with uncertain processing time , 2015, Int. J. Comput. Integr. Manuf..
[6] Surendra M. Gupta,et al. Lot sizing in reverse MRP for scheduling disassembly , 2008 .
[7] Roussos Dimitrakopoulos,et al. Long-term mine production scheduling with multiple processing destinations under mineral supply uncertainty, based on multi-neighbourhood Tabu search , 2020, International Journal of Mining, Reclamation and Environment.
[8] Zhi-Hai Zhang,et al. Capacitated disassembly scheduling with parts commonality and start-up cost and its industrial application , 2016 .
[9] Lionel Amodeo,et al. Economic order quantity for multistage disassembly systems , 2018 .
[10] Mark Goh,et al. Optimisation of production scheduling for multi-product orders in VCIM systems using GA , 2019, Soft Comput..
[11] Ceyda Oguz,et al. A tabu search algorithm for order acceptance and scheduling , 2012, Comput. Oper. Res..
[12] Xiaoyu Tian,et al. Capacitated disassembly scheduling and pricing of returned products with price-dependent yield , 2019, Omega.
[13] Eugenia Babiloni,et al. On the exact calculation of the fill rate in a periodic review inventory policy under discrete demand patterns , 2012, Eur. J. Oper. Res..
[14] Karl Inderfurth,et al. Heuristics for solving disassemble-to-order problems with stochastic yields , 2006, OR Spectr..
[15] Thomas Becker,et al. Application of a modified GA, ACO and a random search procedure to solve the production scheduling of a case study bakery , 2014, Expert Syst. Appl..
[16] Surendra M. Gupta,et al. Disassembly of multiple product structures , 1997 .
[17] S. Meysam Mousavi,et al. A three level joint location-inventory problem with correlated demand, shortages and periodic review system: Robust meta-heuristics , 2017, Comput. Ind. Eng..
[18] Yue Meng,et al. Hybrid algorithm based on improved extended shifting bottleneck procedure and GA for assembly job shop scheduling problem , 2020, Int. J. Prod. Res..
[19] Manoj Kumar Tiwari,et al. Constraint-based simulated annealing (CBSA) approach to solve the disassembly scheduling problem , 2012 .
[20] H. Tempelmeier. A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint , 2011 .
[21] Yandong He,et al. ELV Recycling Service Provider Selection Using the Hybrid MCDM Method: A Case Application in China , 2016 .
[22] Uday S. Karmarkar,et al. Lot Sizes, Lead Times and In-Process Inventories , 1987 .
[23] Zhi-Hai Zhang,et al. Capacitated disassembly scheduling under stochastic yield and demand , 2017, Eur. J. Oper. Res..
[24] E. Silver,et al. The exact fill rate in a periodic review base stock system under normally distributed demand , 2011 .
[25] Daniele Vigo,et al. A Multi-Depot Two-Echelon Vehicle Routing Problem with Delivery Options Arising in the Last Mile Distribution , 2018, Eur. J. Oper. Res..
[26] Dong-Ho Lee,et al. A two-stage heuristic for disassembly scheduling with assembly product structure , 2004, J. Oper. Res. Soc..
[27] Stephen Michael Disney,et al. Fill rate in a periodic review order-up-to policy under auto-correlated normally distributed, possibly negative, demand , 2015 .
[28] P. Xirouchakis,et al. Capacitated disassembly scheduling with random demand , 2010 .
[29] Fuli Zhou,et al. What attracts vehicle consumers' buying , 2019, Ind. Manag. Data Syst..
[30] MengChu Zhou,et al. Target Disassembly Sequencing and Scheme Evaluation for CNC Machine Tools Using Improved Multiobjective Ant Colony Algorithm and Fuzzy Integral , 2019, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[31] K. Lai,et al. Promoting sustainability of manufacturing industry through the lean energy-saving and emission-reduction strategy. , 2019, The Science of the total environment.
[32] Fayez F. Boctor,et al. An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case , 2018, Eur. J. Oper. Res..
[33] Shixin Liu,et al. Multiresource-Constrained Selective Disassembly With Maximal Profit and Minimal Energy Consumption , 2021, IEEE Transactions on Automation Science and Engineering.
[34] Alexandre Dolgui,et al. An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times , 2015 .
[35] Dong-Ho Lee,et al. A branch and bound algorithm for disassembly scheduling with assembly product structure , 2009, J. Oper. Res. Soc..
[36] Christian Ullerich,et al. Flexible disassembly planning considering product conditions , 2013 .
[37] Paul Xirouchakis,et al. Disassembly Scheduling with Capacity Constraints , 2002 .
[38] Duc Truong Pham,et al. Scheduling of Robotic Disassembly in Remanufacturing Using Bees Algorithms , 2020 .
[39] Xu Wang,et al. Sustainable recycling partner selection using fuzzy DEMATEL-AEW-FVIKOR: A case study in small-and-medium enterprises (SMEs) , 2018, Journal of Cleaner Production.
[40] MengChu Zhou,et al. Modeling and Planning for Dual-Objective Selective Disassembly Using and/or Graph and Discrete Artificial Bee Colony , 2019, IEEE Transactions on Industrial Informatics.
[41] Yigal Gerchak,et al. Capacity Games in Assembly Systems with Uncertain Demand , 2003, Manuf. Serv. Oper. Manag..
[42] Uday S. Rao,et al. Component procurement and end product assembly in an uncertain supply and demand environment , 2015 .
[43] Xu Wang,et al. Supplier portfolio of key outsourcing parts selection using a two-stage decision making framework for Chinese domestic auto-maker , 2019, Comput. Ind. Eng..
[44] Miran Brezocnik,et al. Multi-objective optimization of production scheduling with evolutionary computation: A review , 2020 .
[45] Benoît Iung,et al. Sustainable management of end-of-life systems , 2012 .
[46] Surendra M. Gupta,et al. Disassembly of complex product structures with parts and materials commonality , 1997 .
[47] Xu Wang,et al. Model and algorithm for bilevel multisized terminal location-routing problem for the last mile delivery , 2019, Int. Trans. Oper. Res..
[48] Erwin van der Laan,et al. Quantitative models for reverse logistics: A review , 1997 .
[49] F. L. Zhou,et al. Production lot-sizing decision making considering bottle-neck drift in multi-stage manufacturing system , 2017 .
[50] Rizauddin Ramli,et al. Disassemblability of end-of-life vehicle: a critical review of evaluation methods , 2011 .
[51] Shun Jia,et al. Energy modeling method of machine-operator system for sustainable machining , 2018, Energy Conversion and Management.
[52] Marco Pierini,et al. Evaluation of the end-of-life performance of a hybrid scooter with the application of recyclability and recoverability assessment methods , 2016 .
[53] Alan M. Ferrenberg,et al. Pushing the limits of Monte Carlo simulations for the three-dimensional Ising model. , 2018, Physical review. E.
[54] Dong-Ho Lee,et al. Disassembly scheduling: literature review and future research directions , 2007 .
[55] Franz Ehm. A data-driven modeling approach for integrated disassembly planning and scheduling , 2019 .
[56] Surendra M. Gupta,et al. Disassembly to order system under uncertainty , 2006 .
[57] Michel Gendreau,et al. A capacitated lot sizing problem with stochastic setup times and overtime , 2019, Eur. J. Oper. Res..
[58] G. Wets,et al. Modeling the Perceptions and Preferences of Pedestrians on Crossing Facilities , 2014 .
[59] Roberto Rossi,et al. Piecewise linear approximations for the static-dynamic uncertainty strategy in stochastic lot-sizing , 2013, ArXiv.
[60] Hajo A. Reijers,et al. The Share-a-Ride problem with stochastic travel times and stochastic delivery locations , 2016 .
[61] Ponnuthurai Nagaratnam Suganthan,et al. A survey on meta-heuristics for solving disassembly line balancing, planning and scheduling problems in remanufacturing , 2020, Swarm Evol. Comput..
[62] MengChu Zhou,et al. A methodology for modeling and adaptive planning of disassembly processes , 1999, IEEE Trans. Robotics Autom..
[63] P. Xirouchakis,et al. Disassembly Scheduling with Multiple Product Types , 2003 .
[64] C. Liao,et al. An Analytical Determination of Lead Time with Normal Demand , 1991 .
[65] Yandong He,et al. End-of-life vehicle (ELV) recycling management: Improving performance using an ISM approach , 2019, Journal of Cleaner Production.
[66] Shixin Liu,et al. Lexicographic Multiobjective Scatter Search for the Optimization of Sequence-Dependent Selective Disassembly Subject to Multiresource Constraints , 2020, IEEE Transactions on Cybernetics.