Capacitated disassembly scheduling with random demand and operation time

[1]  Y. Geng,et al.  An overview of China’s recyclable waste recycling and recommendations for integrated solutions , 2018, Resources, Conservation and Recycling.

[2]  Idiano D’Adamo,et al.  Remanufacturing in industry: advices from the field , 2016 .

[3]  Jing-Sheng Song,et al.  Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty , 2000, Manuf. Serv. Oper. Manag..

[4]  MengChu Zhou,et al.  Scheduling Dual-Objective Stochastic Hybrid Flow Shop With Deteriorating Jobs via Bi-Population Evolutionary Algorithm , 2020, IEEE Transactions on Systems, Man, and Cybernetics: Systems.

[5]  Ming Li,et al.  Due date assignment and dynamic scheduling of one-of-a-kind assembly production with uncertain processing time , 2015, Int. J. Comput. Integr. Manuf..

[6]  Surendra M. Gupta,et al.  Lot sizing in reverse MRP for scheduling disassembly , 2008 .

[7]  Roussos Dimitrakopoulos,et al.  Long-term mine production scheduling with multiple processing destinations under mineral supply uncertainty, based on multi-neighbourhood Tabu search , 2020, International Journal of Mining, Reclamation and Environment.

[8]  Zhi-Hai Zhang,et al.  Capacitated disassembly scheduling with parts commonality and start-up cost and its industrial application , 2016 .

[9]  Lionel Amodeo,et al.  Economic order quantity for multistage disassembly systems , 2018 .

[10]  Mark Goh,et al.  Optimisation of production scheduling for multi-product orders in VCIM systems using GA , 2019, Soft Comput..

[11]  Ceyda Oguz,et al.  A tabu search algorithm for order acceptance and scheduling , 2012, Comput. Oper. Res..

[12]  Xiaoyu Tian,et al.  Capacitated disassembly scheduling and pricing of returned products with price-dependent yield , 2019, Omega.

[13]  Eugenia Babiloni,et al.  On the exact calculation of the fill rate in a periodic review inventory policy under discrete demand patterns , 2012, Eur. J. Oper. Res..

[14]  Karl Inderfurth,et al.  Heuristics for solving disassemble-to-order problems with stochastic yields , 2006, OR Spectr..

[15]  Thomas Becker,et al.  Application of a modified GA, ACO and a random search procedure to solve the production scheduling of a case study bakery , 2014, Expert Syst. Appl..

[16]  Surendra M. Gupta,et al.  Disassembly of multiple product structures , 1997 .

[17]  S. Meysam Mousavi,et al.  A three level joint location-inventory problem with correlated demand, shortages and periodic review system: Robust meta-heuristics , 2017, Comput. Ind. Eng..

[18]  Yue Meng,et al.  Hybrid algorithm based on improved extended shifting bottleneck procedure and GA for assembly job shop scheduling problem , 2020, Int. J. Prod. Res..

[19]  Manoj Kumar Tiwari,et al.  Constraint-based simulated annealing (CBSA) approach to solve the disassembly scheduling problem , 2012 .

[20]  H. Tempelmeier A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint , 2011 .

[21]  Yandong He,et al.  ELV Recycling Service Provider Selection Using the Hybrid MCDM Method: A Case Application in China , 2016 .

[22]  Uday S. Karmarkar,et al.  Lot Sizes, Lead Times and In-Process Inventories , 1987 .

[23]  Zhi-Hai Zhang,et al.  Capacitated disassembly scheduling under stochastic yield and demand , 2017, Eur. J. Oper. Res..

[24]  E. Silver,et al.  The exact fill rate in a periodic review base stock system under normally distributed demand , 2011 .

[25]  Daniele Vigo,et al.  A Multi-Depot Two-Echelon Vehicle Routing Problem with Delivery Options Arising in the Last Mile Distribution , 2018, Eur. J. Oper. Res..

[26]  Dong-Ho Lee,et al.  A two-stage heuristic for disassembly scheduling with assembly product structure , 2004, J. Oper. Res. Soc..

[27]  Stephen Michael Disney,et al.  Fill rate in a periodic review order-up-to policy under auto-correlated normally distributed, possibly negative, demand , 2015 .

[28]  P. Xirouchakis,et al.  Capacitated disassembly scheduling with random demand , 2010 .

[29]  Fuli Zhou,et al.  What attracts vehicle consumers' buying , 2019, Ind. Manag. Data Syst..

[30]  MengChu Zhou,et al.  Target Disassembly Sequencing and Scheme Evaluation for CNC Machine Tools Using Improved Multiobjective Ant Colony Algorithm and Fuzzy Integral , 2019, IEEE Transactions on Systems, Man, and Cybernetics: Systems.

[31]  K. Lai,et al.  Promoting sustainability of manufacturing industry through the lean energy-saving and emission-reduction strategy. , 2019, The Science of the total environment.

[32]  Fayez F. Boctor,et al.  An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case , 2018, Eur. J. Oper. Res..

[33]  Shixin Liu,et al.  Multiresource-Constrained Selective Disassembly With Maximal Profit and Minimal Energy Consumption , 2021, IEEE Transactions on Automation Science and Engineering.

[34]  Alexandre Dolgui,et al.  An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times , 2015 .

[35]  Dong-Ho Lee,et al.  A branch and bound algorithm for disassembly scheduling with assembly product structure , 2009, J. Oper. Res. Soc..

[36]  Christian Ullerich,et al.  Flexible disassembly planning considering product conditions , 2013 .

[37]  Paul Xirouchakis,et al.  Disassembly Scheduling with Capacity Constraints , 2002 .

[38]  Duc Truong Pham,et al.  Scheduling of Robotic Disassembly in Remanufacturing Using Bees Algorithms , 2020 .

[39]  Xu Wang,et al.  Sustainable recycling partner selection using fuzzy DEMATEL-AEW-FVIKOR: A case study in small-and-medium enterprises (SMEs) , 2018, Journal of Cleaner Production.

[40]  MengChu Zhou,et al.  Modeling and Planning for Dual-Objective Selective Disassembly Using and/or Graph and Discrete Artificial Bee Colony , 2019, IEEE Transactions on Industrial Informatics.

[41]  Yigal Gerchak,et al.  Capacity Games in Assembly Systems with Uncertain Demand , 2003, Manuf. Serv. Oper. Manag..

[42]  Uday S. Rao,et al.  Component procurement and end product assembly in an uncertain supply and demand environment , 2015 .

[43]  Xu Wang,et al.  Supplier portfolio of key outsourcing parts selection using a two-stage decision making framework for Chinese domestic auto-maker , 2019, Comput. Ind. Eng..

[44]  Miran Brezocnik,et al.  Multi-objective optimization of production scheduling with evolutionary computation: A review , 2020 .

[45]  Benoît Iung,et al.  Sustainable management of end-of-life systems , 2012 .

[46]  Surendra M. Gupta,et al.  Disassembly of complex product structures with parts and materials commonality , 1997 .

[47]  Xu Wang,et al.  Model and algorithm for bilevel multisized terminal location-routing problem for the last mile delivery , 2019, Int. Trans. Oper. Res..

[48]  Erwin van der Laan,et al.  Quantitative models for reverse logistics: A review , 1997 .

[49]  F. L. Zhou,et al.  Production lot-sizing decision making considering bottle-neck drift in multi-stage manufacturing system , 2017 .

[50]  Rizauddin Ramli,et al.  Disassemblability of end-of-life vehicle: a critical review of evaluation methods , 2011 .

[51]  Shun Jia,et al.  Energy modeling method of machine-operator system for sustainable machining , 2018, Energy Conversion and Management.

[52]  Marco Pierini,et al.  Evaluation of the end-of-life performance of a hybrid scooter with the application of recyclability and recoverability assessment methods , 2016 .

[53]  Alan M. Ferrenberg,et al.  Pushing the limits of Monte Carlo simulations for the three-dimensional Ising model. , 2018, Physical review. E.

[54]  Dong-Ho Lee,et al.  Disassembly scheduling: literature review and future research directions , 2007 .

[55]  Franz Ehm A data-driven modeling approach for integrated disassembly planning and scheduling , 2019 .

[56]  Surendra M. Gupta,et al.  Disassembly to order system under uncertainty , 2006 .

[57]  Michel Gendreau,et al.  A capacitated lot sizing problem with stochastic setup times and overtime , 2019, Eur. J. Oper. Res..

[58]  G. Wets,et al.  Modeling the Perceptions and Preferences of Pedestrians on Crossing Facilities , 2014 .

[59]  Roberto Rossi,et al.  Piecewise linear approximations for the static-dynamic uncertainty strategy in stochastic lot-sizing , 2013, ArXiv.

[60]  Hajo A. Reijers,et al.  The Share-a-Ride problem with stochastic travel times and stochastic delivery locations , 2016 .

[61]  Ponnuthurai Nagaratnam Suganthan,et al.  A survey on meta-heuristics for solving disassembly line balancing, planning and scheduling problems in remanufacturing , 2020, Swarm Evol. Comput..

[62]  MengChu Zhou,et al.  A methodology for modeling and adaptive planning of disassembly processes , 1999, IEEE Trans. Robotics Autom..

[63]  P. Xirouchakis,et al.  Disassembly Scheduling with Multiple Product Types , 2003 .

[64]  C. Liao,et al.  An Analytical Determination of Lead Time with Normal Demand , 1991 .

[65]  Yandong He,et al.  End-of-life vehicle (ELV) recycling management: Improving performance using an ISM approach , 2019, Journal of Cleaner Production.

[66]  Shixin Liu,et al.  Lexicographic Multiobjective Scatter Search for the Optimization of Sequence-Dependent Selective Disassembly Subject to Multiresource Constraints , 2020, IEEE Transactions on Cybernetics.